Copyright © 2024 the Contributors to the Risk Extension Specification, published by the Data Privacy Vocabularies and Controls Community Group under the W3C Community Final Specification Agreement (FSA). A human-readable summary is available.
The RISK extension to Data Privacy Vocabulary (DPV) Specification provides concepts for representing information associated with risk management, assessment, controls, and consequences. The namespace for terms in risk is https://www.w3id.org/dpv/risk#
. The suggested prefix for the namespace is risk
. The risk vocabulary and its documentation is available on GitHub.
This specification was published by the Data Privacy Vocabularies and Controls Community Group. It is not a W3C Standard nor is it on the W3C Standards Track. Please note that under the W3C Community Final Specification Agreement (FSA) other conditions apply. Learn more about W3C Community and Business Groups.
Contributing: The DPVCG welcomes participation to improve the DPV and associated resources, including expansion or refinement of concepts, requesting information and applications, and addressing open issues. See contributing guide for further information.
GitHub Issues are preferred for discussion of this specification.
Data Privacy Vocabulary (DPV) Specification: is the base/core specification for the 'Data Privacy Vocabulary', which is extended for Personal Data [PD], Locations [LOC], Risk Management [RISK], Technology [TECH], and [AI]. Specific [LEGAL] extensions are also provided which model jurisdiction specific regulations and concepts . To support understanding and applications of [DPV], various guides and resources [GUIDES] are provided, including a [PRIMER]. A Search Index of all concepts from DPV and extensions is available.
[DPV] and related resources are published on GitHub. For a general overview of the Data Protection Vocabularies and Controls Community Group [DPVCG], its history, deliverables, and activities - refer to DPVCG Website. For meetings, see the DPVCG calendar.
The peer-reviewed article “Creating A Vocabulary for Data Privacy” presents a historical overview of the DPVCG, and describes the methodology and structure of the DPV along with describing its creation. An open-access version can be accessed here, here, and here. The article Data Privacy Vocabulary (DPV) - Version 2, accepted for presentation at the 23rd International Semantic Web Conference (ISWC 2024), describes the changes made in DPV v2.
[DPV] provides a minimal set of risk assessment concepts that include dpv:RiskAssessment
dpv:Risk
, dpv:RiskMitigation
, dpv:Severity
, dpv:Likelihood
, dpv:Consequence
, and dpv:Impact
along with relations or properties to use them. To further assist tasks and representation of information regarding risk assessments, as well as to support the implementation of risk management, the [RISK] extension provide additional concepts and taxonomies through which risks and impacts can be defined - such as to describe incidents, data breaches, their associate reports and notices, risk matrices, and other risk management processes.
The RISK extension utilises the following sources to guide and define its concepts and taxonomies:
The core concepts involves reuse of the following concepts from [DPV]:
dpv:Risk
represents the concept of 'risk' i.e. a possibility or potential of negative events to occur, and is indicated using the relation dpv:hasRisk
.dpv:RiskMitigationMeasure
represents a method or process or control to mitigate the risk, and is associated using the relation dpv:isMitigatedByMeasure
dpv:Consequence
represents the consequences of risks and incidents, and is associated using the relation dpv:hasConsequence
. To indicate who or what the consequence affects, the relation hasConsequenceOn
is used. The [RISK] extension provides a taxonomy of consequences and impacts.dpv:Impact
represents the impacts of the risks and incidents on entities, and is associated using the relation dpv:hasImpact
. To indicate who the impact affects, the relation hasImpactOn
is used.dpv:Severity
represents the severity of risks and incidents, and is indicated using dpv:hasSeverity
.dpv:Likelihood
represents the likelihood of risks and incidents, and is indicated using dpv:hasLikelihood
.dpv:RiskLevel
represents the level of risks and incidents, and is indicated using dpv:hasRiskLevel
. The [RISK] extension provides a taxonomy of risk levels.The new concepts introduced in this extension include the following:
dpv:hasStatus
.To express likelihoods, severities, and levels in a convenient manner, the RISK extension provides the following groups of concepts. Each concept is associated with a suggested value to represent the extent or degree of the concept between 0..1
using rdf:value
e.g. ExtremelyLowRisk has a value of 0.01
and HighLikelihood has a value of 0.75
. Each group uses these values to express a range within a group e.g. in 3LikelihoodLevels the LowLikelihood (0.25) covers the range 0 to 0.25, while in 7LikelihoodLevels it covers the range from 0.1 (VeryLowLikelihood) to 0.25. Adopters can thus choose the appropriate ranges, and as the values are suggestions - they can be changed to match the requirements of the use-case.
To represent details about an Incident such as what personal data was involved, what technical measures were present before the incident occured, who were data subjects involved, and other pertinent details, the [DPV] concepts and relations should be reused.
To indicate the duration of the incident, the [DPV] concept dpv:Duration
and relation dpv:hasRelation
can be used, or dct:temporal
from [DCT] can be used, or other means such as the [TIME] ontology or XSD types. If this information is unknown, then dpv:NotAvailable
should be used. If the incident is ongoing, only the start would be available (also see IncidentStatus).
To indicate whether the incident is ongoing or concluded (on its own) or it was terminated due to some action taken, the concept IncidentStatus is provided along with a taxonomy of statuses which are indicated using the relation dpv:hasStatus
.
RiskControl allows expressing how [DPV] technical and organisational measures address the risk or incident. They are associated using the relation hasControl. For example, ConsequenceControl is applied to consequences and impacts to either change them (ChangeConsequence) such as by reducing their likelihood or severity, or removing them (RemoveConsequence) completely. MonitorControl represents controls used to monitor events or effectiveness, such as to detect impacts (MonitorImpact) or identify vulnerabilities (MonitorVulnerabilities).
The RISK extension provides a taxonomy to expand upon the [DPV] concepts of dpv:Consequence
and dpv:Impact
. In [DPV], consequence is in general an outcome of an event, while impacts are a specific subset of consequences which affect entities (as compared to systems and technologies). The intent of this distinction is to support regulatory requirements such as impact assessments which are focused on how processes affect entities such as individuals and societal groups.
Broadly, the taxonomy is based on the following commonly required concepts:
Risk Matrix is a popularly used technique for qualitative risk analysis, through which a risk's likelihood and severity are used to obtain an overall risk level. To support its use, the RISK taxonomy provides concepts representing risk matrices of the format 3x3, 5x5, and 7x7. The concepts are expressed as combinations of Severity (Sx
) and Likelihood (Lx
) levels, and the resulting Risk Level (Lx
) being used as its label. For example, the concept RM3x3S1L3 represents a node in a 3x3 matrix with Severity and Likelihood level low (n=1) and Likelihood level high (n=3) with a resulting Risk Level of 'Moderate'. Similarly, RM7x7S4L7 represents a node in a 7x7 risk matrix with Severity level moderate (n=4) and Likelihood level extremely high (n=7) with the resulting Risk Level of 'Very High Risk'.
It is possible to change the risk levels for the risk matrix by replacing the supplied labels with a custom one. For example, to indicate that the concept RM3x3S1L3 should be 'Low Risk' instead of 'Moderate'.
Term | 3LikelihoodLevels | Prefix | risk |
---|---|---|---|
Label | 3 Likelihood Levels | ||
IRI | https://w3id.org/dpv/risk#3LikelihoodLevels | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Scale with 3 Likelihood Levels from High to Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | 3RiskLevels | Prefix | risk |
---|---|---|---|
Label | 3 Risk Levels | ||
IRI | https://w3id.org/dpv/risk#3RiskLevels | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Scale with 3 Risk Levels from High to Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | 3SeverityLevels | Prefix | risk |
---|---|---|---|
Label | 3 Severity Levels | ||
IRI | https://w3id.org/dpv/risk#3SeverityLevels | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Scale with 3 Severity Levels from High to Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | 5LikelihoodLevels | Prefix | risk |
---|---|---|---|
Label | 5 Likelihood Levels | ||
IRI | https://w3id.org/dpv/risk#5LikelihoodLevels | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Scale with 5 Likelihood Levels from Very High to Very Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | 5RiskLevels | Prefix | risk |
---|---|---|---|
Label | 5 Risk Levels | ||
IRI | https://w3id.org/dpv/risk#5RiskLevels | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Scale with 5 Risk Levels from Very High to Very Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | 5SeverityLevels | Prefix | risk |
---|---|---|---|
Label | 5 Severity Levels | ||
IRI | https://w3id.org/dpv/risk#5SeverityLevels | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Scale with 5 Severity Levels from Very High to Very Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | 7LikelihoodLevels | Prefix | risk |
---|---|---|---|
Label | 7 Likelihood Levels | ||
IRI | https://w3id.org/dpv/risk#7LikelihoodLevels | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Scale with 7 Likelihood Levels from Extremely High to Extremely Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | 7RiskLevels | Prefix | risk |
---|---|---|---|
Label | 7 Risk Levels | ||
IRI | https://w3id.org/dpv/risk#7RiskLevels | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Scale with 7 Risk Levels from Extremely High to Extremely Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | 7SeverityLevels | Prefix | risk |
---|---|---|---|
Label | 7 Severity Levels | ||
IRI | https://w3id.org/dpv/risk#7SeverityLevels | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Scale with 7 Severity Levels from Extremely High to Extremely Low | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | AbusiveContentUtilisation | Prefix | risk |
---|---|---|---|
Label | Abusive Content Utilisation | ||
IRI | https://w3id.org/dpv/risk#AbusiveContentUtilisation | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Abusive Content Utilisation | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | AccidentalIncident | Prefix | risk |
---|---|---|---|
Label | Accidental Incident | ||
IRI | https://w3id.org/dpv/risk#AccidentalIncident | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:Incident | ||
Object of relation | risk:hasIncident | ||
Definition | Incident caused due to accidental actions arising from human or human-controlled situations | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | AttackonPrivateLife | Prefix | risk |
---|---|---|---|
Label | Attack on Private Life | ||
IRI | https://w3id.org/dpv/risk#AttackonPrivateLife | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Attack on Private Life | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | AuthorisationFailure | Prefix | risk |
---|---|---|---|
Label | Authorisation Failure | ||
IRI | https://w3id.org/dpv/risk#AuthorisationFailure | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Authorisation Failure | ||
Source | ENISa Trust Services Security Incidents 2021 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | AvailabilityIncident | Prefix | risk |
---|---|---|---|
Label | Availability Incident | ||
IRI | https://w3id.org/dpv/risk#AvailabilityIncident | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:Incident | ||
Object of relation | risk:hasIncident | ||
Definition | Incident where the availability of information or system has been affected | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | AvoidSource | Prefix | risk |
---|---|---|---|
Label | Avoid Source | ||
IRI | https://w3id.org/dpv/risk#AvoidSource | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:SourceControl → risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that avoids the risk source | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | Benefit | Prefix | risk |
---|---|---|---|
Label | Benefit | ||
IRI | https://w3id.org/dpv/risk#Benefit | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Definition | Impact(s) that acts as or causes benefits | ||
Date Created | 2022-03-23 | ||
Contributors | Harshvardhan J. Pandit, Julian Flake, Georg P. Krog, Fajar Ekaputra, Beatriz Esteves, Axel Polleres | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | Blackmail | Prefix | risk |
---|---|---|---|
Label | Blackmail | ||
IRI | https://w3id.org/dpv/risk#Blackmail | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Blackmail | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | BruteForceAuthorisations | Prefix | risk |
---|---|---|---|
Label | Brute Force Authorisations | ||
IRI | https://w3id.org/dpv/risk#BruteForceAuthorisations | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Brute Force Authorisations | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | Businessdisruption | Prefix | risk |
---|---|---|---|
Label | Business disruption | ||
IRI | https://w3id.org/dpv/risk#Businessdisruption | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Business disruption | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | BusinessImpact | Prefix | risk |
---|---|---|---|
Label | Business impact | ||
IRI | https://w3id.org/dpv/risk#BusinessImpact | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Business impact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | BusinessPerformanceImpairment | Prefix | risk |
---|---|---|---|
Label | Business Performance Impairment | ||
IRI | https://w3id.org/dpv/risk#BusinessPerformanceImpairment | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Business Performance Impairment | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | ChangeConsequence | Prefix | risk |
---|---|---|---|
Label | Change Consequence | ||
IRI | https://w3id.org/dpv/risk#ChangeConsequence | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:ConsequenceControl → risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that changes Consequence | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | ChangeImpact | Prefix | risk |
---|---|---|---|
Label | Change Impact | ||
IRI | https://w3id.org/dpv/risk#ChangeImpact | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:ImpactControl → risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that changes Impact | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | ChildViolence | Prefix | risk |
---|---|---|---|
Label | Child Violence | ||
IRI | https://w3id.org/dpv/risk#ChildViolence | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Child Violence | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CitizensImpact | Prefix | risk |
---|---|---|---|
Label | Citizens impact | ||
IRI | https://w3id.org/dpv/risk#CitizensImpact | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Citizens impact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | Coercion | Prefix | risk |
---|---|---|---|
Label | Coercion | ||
IRI | https://w3id.org/dpv/risk#Coercion | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Coercion | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | Compensation | Prefix | risk |
---|---|---|---|
Label | Compensation | ||
IRI | https://w3id.org/dpv/risk#Compensation | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | risk:Benefit → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Definition | Compensation provided (as an impact) | ||
Date Created | 2024-04-14 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | ComplianceImpact | Prefix | risk |
---|---|---|---|
Label | Compliance impact | ||
IRI | https://w3id.org/dpv/risk#ComplianceImpact | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Compliance impact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CompromiseAccount | Prefix | risk |
---|---|---|---|
Label | Compromise Account | ||
IRI | https://w3id.org/dpv/risk#CompromiseAccount | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Compromise Account | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CompromiseAccountCredentials | Prefix | risk |
---|---|---|---|
Label | Compromise Account Credentials | ||
IRI | https://w3id.org/dpv/risk#CompromiseAccountCredentials | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Compromise Account Credentials | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CompromiseAccountSecurity | Prefix | risk |
---|---|---|---|
Label | Compromise Account Security | ||
IRI | https://w3id.org/dpv/risk#CompromiseAccountSecurity | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Compromise Account Security | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | ConfidentialityBreach | Prefix | risk |
---|---|---|---|
Label | Confidentiality Breach | ||
IRI | https://w3id.org/dpv/risk#ConfidentialityBreach | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Confidentiality Breach | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | ConfidentialityIncident | Prefix | risk |
---|---|---|---|
Label | Confidentiality Incident | ||
IRI | https://w3id.org/dpv/risk#ConfidentialityIncident | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:Incident | ||
Object of relation | risk:hasIncident | ||
Definition | Incident where the confidentiality of information or system has been affected | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | ConsequenceControl | Prefix | risk |
---|---|---|---|
Label | Consequence Control | ||
IRI | https://w3id.org/dpv/risk#ConsequenceControl | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Risk Mitigation Measure that controls the Consequences | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | ConsequenceForDataSubject | Prefix | risk |
---|---|---|---|
Label | Consequence for Data Subject | ||
IRI | https://w3id.org/dpv/risk#ConsequenceForDataSubject | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Consequence for Data Subject | ||
Date Created | 2022-10-22 | ||
Contributors | Harshvardhan J. Pandit, Georg P. Krog | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | ConsequenceOnDataSecurity | Prefix | risk |
---|---|---|---|
Label | Consequence on Data Security | ||
IRI | https://w3id.org/dpv/risk#ConsequenceOnDataSecurity | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Consequence on Data Security | ||
Date Created | 2022-10-22 | ||
Contributors | Harshvardhan J. Pandit, Georg P. Krog | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | ContainmentControl | Prefix | risk |
---|---|---|---|
Label | Containment Control | ||
IRI | https://w3id.org/dpv/risk#ContainmentControl | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control to contain event | ||
Date Created | 2024-05-19 | ||
See More: | section RISK-CONTROLS in RISK |
Term | CopyrightViolation | Prefix | risk |
---|---|---|---|
Label | Copyright Violation | ||
IRI | https://w3id.org/dpv/risk#CopyrightViolation | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Copyright Violation | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CorruptionData | Prefix | risk |
---|---|---|---|
Label | Corruption of Data | ||
IRI | https://w3id.org/dpv/risk#CorruptionData | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Corruption of Data | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CostAcquisition | Prefix | risk |
---|---|---|---|
Label | Cost of Acquisition | ||
IRI | https://w3id.org/dpv/risk#CostAcquisition | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Cost of Acquisition | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CostBackup | Prefix | risk |
---|---|---|---|
Label | Cost of Backup | ||
IRI | https://w3id.org/dpv/risk#CostBackup | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Cost of Backup | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CostConfiguration | Prefix | risk |
---|---|---|---|
Label | Cost of Configuration | ||
IRI | https://w3id.org/dpv/risk#CostConfiguration | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Cost of Configuration | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CostInstallation | Prefix | risk |
---|---|---|---|
Label | Cost of Installation | ||
IRI | https://w3id.org/dpv/risk#CostInstallation | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Cost of Installation | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CostJudicialPenalties | Prefix | risk |
---|---|---|---|
Label | Cost of Judicial Penalties | ||
IRI | https://w3id.org/dpv/risk#CostJudicialPenalties | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Cost of Judicial Penalties | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CostJudicialProceedings | Prefix | risk |
---|---|---|---|
Label | Cost of Judicial Proceedings | ||
IRI | https://w3id.org/dpv/risk#CostJudicialProceedings | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Cost of Judicial Proceedings | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CostOperationInterruption | Prefix | risk |
---|---|---|---|
Label | Cost of Operation Interruption | ||
IRI | https://w3id.org/dpv/risk#CostOperationInterruption | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Cost of Operation Interruption | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CostSuspendedOperations | Prefix | risk |
---|---|---|---|
Label | Cost of Suspended Operations | ||
IRI | https://w3id.org/dpv/risk#CostSuspendedOperations | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Cost of Suspended Operations | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CrossBorderIncident | Prefix | risk |
---|---|---|---|
Label | Cross-Border Incident | ||
IRI | https://w3id.org/dpv/risk#CrossBorderIncident | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:Incident | ||
Object of relation | risk:hasIncident | ||
Definition | Incident involving cross-border or multiple jurisdictions | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | Cryptojacking | Prefix | risk |
---|---|---|---|
Label | Cryptojacking | ||
IRI | https://w3id.org/dpv/risk#Cryptojacking | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Cryptojacking or hidden cryptomining is a type of cybercrime where a criminal secretly uses a victim’s computing power to generate cryptocurrency | ||
Source | ENISA Threat Landscape 2021 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CyberSpying | Prefix | risk |
---|---|---|---|
Label | Cyber Spying | ||
IRI | https://w3id.org/dpv/risk#CyberSpying | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Cyber Spying | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | CyberStalking | Prefix | risk |
---|---|---|---|
Label | Cyber Stalking | ||
IRI | https://w3id.org/dpv/risk#CyberStalking | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Cyber Stalking | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | Damage | Prefix | risk |
---|---|---|---|
Label | Damage | ||
IRI | https://w3id.org/dpv/risk#Damage | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Impact that acts as or causes damages | ||
Date Created | 2022-03-30 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | DamageByThirdParty | Prefix | risk |
---|---|---|---|
Label | Damage by Third Party | ||
IRI | https://w3id.org/dpv/risk#DamageByThirdParty | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Damage by Third Party | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | DangertoCustomers | Prefix | risk |
---|---|---|---|
Label | Danger to Customers | ||
IRI | https://w3id.org/dpv/risk#DangertoCustomers | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Danger to Customers | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | DangertoPersonnel | Prefix | risk |
---|---|---|---|
Label | Danger to Personnel | ||
IRI | https://w3id.org/dpv/risk#DangertoPersonnel | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Danger to Personnel | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | DataBreach | Prefix | risk |
---|---|---|---|
Label | Data Breach | ||
IRI | https://w3id.org/dpv/risk#DataBreach | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Data Breach | ||
Examples | dex:E0069 :: Using DPV and RISK extension to represent incidentsdex:E0071 :: Using risk controls to express how tech/org measures address the risk |
||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in DEX |
Term | DeliberateIncident | Prefix | risk |
---|---|---|---|
Label | Deliberate Incident | ||
IRI | https://w3id.org/dpv/risk#DeliberateIncident | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:Incident | ||
Object of relation | risk:hasIncident | ||
Definition | Incident caused due to deliberate actions of a human | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | DenialServiceAttack | Prefix | risk |
---|---|---|---|
Label | Denial of Service Attack (DoS) | ||
IRI | https://w3id.org/dpv/risk#DenialServiceAttack | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Denial of Service Attack (DoS) | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | DetectionControl | Prefix | risk |
---|---|---|---|
Label | Detection Control | ||
IRI | https://w3id.org/dpv/risk#DetectionControl | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control to detect event | ||
Date Created | 2024-05-19 | ||
See More: | section RISK-CONTROLS in RISK |
Term | Detriment | Prefix | risk |
---|---|---|---|
Label | Detriment | ||
IRI | https://w3id.org/dpv/risk#Detriment | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Impact that acts as or causes detriments | ||
Date Created | 2022-03-23 | ||
Contributors | Harshvardhan J. Pandit, Julian Flake, Georg P. Krog, Fajar Ekaputra, Beatriz Esteves | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | DetrimentToRecovery | Prefix | risk |
---|---|---|---|
Label | Detriment to Recovery | ||
IRI | https://w3id.org/dpv/risk#DetrimentToRecovery | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Detriment to Recovery | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | Discrimination | Prefix | risk |
---|---|---|---|
Label | Discrimination | ||
IRI | https://w3id.org/dpv/risk#Discrimination | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Discrimination | ||
Date Created | 2022-08-19 | ||
Contributors | Georg P. Krog | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | DistributedDenialServiceAttack | Prefix | risk |
---|---|---|---|
Label | Distributed Denial of Service Attack (DDoS) | ||
IRI | https://w3id.org/dpv/risk#DistributedDenialServiceAttack | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Distributed Denial of Service Attack (DDoS) | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | Eavesdropping | Prefix | risk |
---|---|---|---|
Label | Eavesdropping | ||
IRI | https://w3id.org/dpv/risk#Eavesdropping | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Eavesdropping | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | EconomicDisadvantage | Prefix | risk |
---|---|---|---|
Label | Economic Disadvantage | ||
IRI | https://w3id.org/dpv/risk#EconomicDisadvantage | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Economic Disadvantage | ||
Date Created | 2022-08-19 | ||
Contributors | Georg P. Krog | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | EnvironmentalIncident | Prefix | risk |
---|---|---|---|
Label | Environmental Incident | ||
IRI | https://w3id.org/dpv/risk#EnvironmentalIncident | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:Incident | ||
Object of relation | risk:hasIncident | ||
Definition | Incident caused due to environmental factors outside human controls | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | EnvironmentalSafetyEndangerment | Prefix | risk |
---|---|---|---|
Label | Environmental Safety Endangerment | ||
IRI | https://w3id.org/dpv/risk#EnvironmentalSafetyEndangerment | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Environmental Safety Endangerment | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | EquipmentFailure | Prefix | risk |
---|---|---|---|
Label | Equipment Failure | ||
IRI | https://w3id.org/dpv/risk#EquipmentFailure | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Equipment Failure | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | EquipmentMalfunction | Prefix | risk |
---|---|---|---|
Label | Equipment Malfunction | ||
IRI | https://w3id.org/dpv/risk#EquipmentMalfunction | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Equipment Malfunction | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | ErroneousSystemUse | Prefix | risk |
---|---|---|---|
Label | Erroneous System Use | ||
IRI | https://w3id.org/dpv/risk#ErroneousSystemUse | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Erroneous System Use | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | Extorsion | Prefix | risk |
---|---|---|---|
Label | Extorsion | ||
IRI | https://w3id.org/dpv/risk#Extorsion | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Extorsion | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | ExtremelyHighLikelihood | Prefix | risk |
---|---|---|---|
Label | Extremely High Likelihood | ||
IRI | https://w3id.org/dpv/risk#ExtremelyHighLikelihood | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | risk:7LikelihoodLevels → dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Level where Likelihood is Extremely High | ||
Usage Note | The suggested quantitative value for this concept is 0.99 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | ExtremelyHighRisk | Prefix | risk |
---|---|---|---|
Label | Extremely High Risk | ||
IRI | https://w3id.org/dpv/risk#ExtremelyHighRisk | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | risk:7RiskLevels → dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Level where Risk is Extremely High | ||
Usage Note | The suggested quantitative value for this concept is 0.99 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | ExtremelyHighSeverity | Prefix | risk |
---|---|---|---|
Label | Extremely High Severity | ||
IRI | https://w3id.org/dpv/risk#ExtremelyHighSeverity | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | risk:7SeverityLevels → dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Level where Severity is Extremely High | ||
Usage Note | The suggested quantitative value for this concept is 0.99 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | ExtremelyLowLikelihood | Prefix | risk |
---|---|---|---|
Label | Extremely Low Likelihood | ||
IRI | https://w3id.org/dpv/risk#ExtremelyLowLikelihood | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | risk:7LikelihoodLevels → dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Level where Likelihood is Extremely Low | ||
Usage Note | The suggested quantitative value for this concept is 0.01 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | ExtremelyLowRisk | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk | ||
IRI | https://w3id.org/dpv/risk#ExtremelyLowRisk | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | risk:7RiskLevels → dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Level where Risk is Extremely Low | ||
Usage Note | The suggested quantitative value for this concept is 0.01 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | ExtremelyLowSeverity | Prefix | risk |
---|---|---|---|
Label | Extremely Low Severity | ||
IRI | https://w3id.org/dpv/risk#ExtremelyLowSeverity | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | risk:7SeverityLevels → dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Level where Severity is Extremely Low | ||
Usage Note | The suggested quantitative value for this concept is 0.01 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | Fee | Prefix | risk |
---|---|---|---|
Label | Fee | ||
IRI | https://w3id.org/dpv/risk#Fee | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | risk:Compensation → risk:Benefit → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Definition | Fee provided as compensation (as an impact) | ||
Source | |||
Date Created | 2024-04-14 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | FinancialEquipmentCosts | Prefix | risk |
---|---|---|---|
Label | Financial Equipment Costs | ||
IRI | https://w3id.org/dpv/risk#FinancialEquipmentCosts | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Financial Equipment Costs | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | FinancialInvestigationCosts | Prefix | risk |
---|---|---|---|
Label | Financial Investigation Costs | ||
IRI | https://w3id.org/dpv/risk#FinancialInvestigationCosts | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Financial Investigation Costs | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | FinancialLoss | Prefix | risk |
---|---|---|---|
Label | Financial Loss | ||
IRI | https://w3id.org/dpv/risk#FinancialLoss | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Financial Loss | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | FinancialPersonnelCosts | Prefix | risk |
---|---|---|---|
Label | Financial Personnel Costs | ||
IRI | https://w3id.org/dpv/risk#FinancialPersonnelCosts | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Financial Personnel Costs | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | FinancialRepairCosts | Prefix | risk |
---|---|---|---|
Label | Financial Repair Costs | ||
IRI | https://w3id.org/dpv/risk#FinancialRepairCosts | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Financial Repair Costs | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | Fraud | Prefix | risk |
---|---|---|---|
Label | Fraud | ||
IRI | https://w3id.org/dpv/risk#Fraud | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Fraud | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | GovernmentCrisis | Prefix | risk |
---|---|---|---|
Label | Government Crisis | ||
IRI | https://w3id.org/dpv/risk#GovernmentCrisis | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Government Crisis | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | HaltSource | Prefix | risk |
---|---|---|---|
Label | Halt Source | ||
IRI | https://w3id.org/dpv/risk#HaltSource | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:SourceControl → risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that halts the risk source or prevents it from materialising | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | Harm | Prefix | risk |
---|---|---|---|
Label | Harm | ||
IRI | https://w3id.org/dpv/risk#Harm | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Impact that acts as or causes harms | ||
Date Created | 2022-08-13 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | HarmfulSpeech | Prefix | risk |
---|---|---|---|
Label | Harmful Speech | ||
IRI | https://w3id.org/dpv/risk#HarmfulSpeech | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Harmful Speech | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | HealthLifeImpact | Prefix | risk |
---|---|---|---|
Label | Health and life impact | ||
IRI | https://w3id.org/dpv/risk#HealthLifeImpact | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Health and life impact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | HighLikelihood | Prefix | risk |
---|---|---|---|
Label | High Likelihood | ||
IRI | https://w3id.org/dpv/risk#HighLikelihood | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | risk:3LikelihoodLevels → dpv:Likelihood | ||
Broader/Parent types | risk:5LikelihoodLevels → dpv:Likelihood | ||
Broader/Parent types | risk:7LikelihoodLevels → dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Level where Likelihood is High | ||
Usage Note | The suggested quantitative value for this concept is 0.75 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | HighRisk | Prefix | risk |
---|---|---|---|
Label | High Risk | ||
IRI | https://w3id.org/dpv/risk#HighRisk | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | risk:3RiskLevels → dpv:RiskLevel | ||
Broader/Parent types | risk:5RiskLevels → dpv:RiskLevel | ||
Broader/Parent types | risk:7RiskLevels → dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Level where Risk is High | ||
Usage Note | The suggested quantitative value for this concept is 0.75 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | HighSeverity | Prefix | risk |
---|---|---|---|
Label | High Severity | ||
IRI | https://w3id.org/dpv/risk#HighSeverity | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | risk:3SeverityLevels → dpv:Severity | ||
Broader/Parent types | risk:5SeverityLevels → dpv:Severity | ||
Broader/Parent types | risk:7SeverityLevels → dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Level where Severity is High | ||
Usage Note | The suggested quantitative value for this concept is 0.75 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | HumanErrors | Prefix | risk |
---|---|---|---|
Label | Human Errors | ||
IRI | https://w3id.org/dpv/risk#HumanErrors | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Human Errors | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | IdentificationControl | Prefix | risk |
---|---|---|---|
Label | Identification Control | ||
IRI | https://w3id.org/dpv/risk#IdentificationControl | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control to identify characteristics of event | ||
Date Created | 2024-05-19 | ||
See More: | section RISK-CONTROLS in RISK |
Term | IdentityDispute | Prefix | risk |
---|---|---|---|
Label | Identity Dispute | ||
IRI | https://w3id.org/dpv/risk#IdentityDispute | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Identity Dispute | ||
Date Created | 2022-08-24 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | IdentityFraud | Prefix | risk |
---|---|---|---|
Label | Identity Fraud | ||
IRI | https://w3id.org/dpv/risk#IdentityFraud | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Identity Fraud | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | IdentityTheft | Prefix | risk |
---|---|---|---|
Label | Identity Theft | ||
IRI | https://w3id.org/dpv/risk#IdentityTheft | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Identity Theft | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | IllegalProcessingData | Prefix | risk |
---|---|---|---|
Label | Illegal Processing of Data | ||
IRI | https://w3id.org/dpv/risk#IllegalProcessingData | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Illegal Processing of Data | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | ImpactControl | Prefix | risk |
---|---|---|---|
Label | Impact Control | ||
IRI | https://w3id.org/dpv/risk#ImpactControl | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Risk Mitigation Measure that controls Impacts | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | ImpactOnDataSubject | Prefix | risk |
---|---|---|---|
Label | Impact on Data Subject | ||
IRI | https://w3id.org/dpv/risk#ImpactOnDataSubject | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Impact on Data Subject | ||
Date Created | 2022-10-22 | ||
Contributors | Harshvardhan J. Pandit, Georg P. Krog | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | ImpactToRights | Prefix | risk |
---|---|---|---|
Label | Impact to Rights | ||
IRI | https://w3id.org/dpv/risk#ImpactToRights | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Impact to Rights | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | Incident | Prefix | risk |
---|---|---|---|
Label | Incident | ||
IRI | https://w3id.org/dpv/risk#Incident | ||
Type | rdfs:Class, skos:Concept | ||
Object of relation | risk:hasIncident | ||
Definition | An actual or occured event | ||
Usage Note | Incident is realised or materialised risk | ||
Examples | dex:E0069 :: Using DPV and RISK extension to represent incidentsdex:E0070 :: Indicating personal data involved in an incident |
||
Date Created | 2024-02-14 | ||
Contributors | Rob Brennan, Harshvardhan J. Pandit, Delaram Golpayegani, Julio Fernandez | ||
See More: | section CORE in DEX , section INCIDENT in DEX |
Term | IncidentAssessmentReport | Prefix | risk |
---|---|---|---|
Label | Incident Assessment Report | ||
IRI | https://w3id.org/dpv/risk#IncidentAssessmentReport | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:IncidentReport → dpv:RecordsOfActivities → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasOrganisationalMeasure, dpv:hasRecordOfActivity, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A report describing the assessment of an incident in terms of its effects or impacts | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | IncidentConcluded | Prefix | risk |
---|---|---|---|
Label | Incident Concluded | ||
IRI | https://w3id.org/dpv/risk#IncidentConcluded | ||
Type | rdfs:Class, skos:Concept, risk:IncidentStatus | ||
Broader/Parent types | risk:IncidentStatus → dpv:Status → dpv:Context | ||
Object of relation | dpv:hasContext, dpv:hasStatus | ||
Definition | The incident has stopped or finished or concluded without any active mitigation and with a low likelihood of resuming or recurring | ||
Date Created | 2024-02-14 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section INCIDENT-STATUS in RISK |
Term | IncidentConcludingReport | Prefix | risk |
---|---|---|---|
Label | Incident Concluding Report | ||
IRI | https://w3id.org/dpv/risk#IncidentConcludingReport | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:IncidentReport → dpv:RecordsOfActivities → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasOrganisationalMeasure, dpv:hasRecordOfActivity, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A report describing the conclusion of an investigation regarding a Incident where all relevant facts are known | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | IncidentDetectionReport | Prefix | risk |
---|---|---|---|
Label | Incident Detection Report | ||
IRI | https://w3id.org/dpv/risk#IncidentDetectionReport | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:IncidentReport → dpv:RecordsOfActivities → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasOrganisationalMeasure, dpv:hasRecordOfActivity, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A report describing the detection of a Incident | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | IncidentHalted | Prefix | risk |
---|---|---|---|
Label | Incident Halted | ||
IRI | https://w3id.org/dpv/risk#IncidentHalted | ||
Type | rdfs:Class, skos:Concept, risk:IncidentStatus | ||
Broader/Parent types | risk:IncidentStatus → dpv:Status → dpv:Context | ||
Object of relation | dpv:hasContext, dpv:hasStatus | ||
Definition | The incident has halted or paused with a high likelihood of resuming or recurring | ||
Date Created | 2024-02-14 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section INCIDENT-STATUS in RISK |
Term | IncidentHandlingReport | Prefix | risk |
---|---|---|---|
Label | Incident Handling Report | ||
IRI | https://w3id.org/dpv/risk#IncidentHandlingReport | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:IncidentReport → dpv:RecordsOfActivities → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasOrganisationalMeasure, dpv:hasRecordOfActivity, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A report describing the response to or handling of an incident regarding the mitigation of its effects and the prevention of its recurrence | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | IncidentIdentifier | Prefix | risk |
---|---|---|---|
Label | Incident Identifier | ||
IRI | https://w3id.org/dpv/risk#IncidentIdentifier | ||
Type | rdfs:Class, skos:Concept | ||
Definition | Identifier associated with an incident | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | IncidentImpactAssessment | Prefix | risk |
---|---|---|---|
Label | Incident Impact Assessment | ||
IRI | https://w3id.org/dpv/risk#IncidentImpactAssessment | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | dpv:ImpactAssessment → dpv:RiskAssessment → dpv:Assessment → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasAssessment, dpv:hasImpactAssessment, dpv:hasOrganisationalMeasure, dpv:hasRiskAssessment, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | An impact assessment associated with a incident | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section INCIDENT in RISK |
Term | IncidentMitigated | Prefix | risk |
---|---|---|---|
Label | Incident Mitigated | ||
IRI | https://w3id.org/dpv/risk#IncidentMitigated | ||
Type | rdfs:Class, skos:Concept, risk:IncidentStatus | ||
Broader/Parent types | risk:IncidentStatus → dpv:Status → dpv:Context | ||
Object of relation | dpv:hasContext, dpv:hasStatus | ||
Definition | The incident has been mitigated against future recurrences i.e. a measure has been applied to prevent the same or similar incident from recurring | ||
Date Created | 2024-02-14 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section INCIDENT-STATUS in RISK |
Term | IncidentMitigationMeasure | Prefix | risk |
---|---|---|---|
Label | Incident Mitigation Measure | ||
IRI | https://w3id.org/dpv/risk#IncidentMitigationMeasure | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure | ||
Definition | A mitigation measure taken in response specifically to mitigate an incident and prevent it from occurring again | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | IncidentNearMiss | Prefix | risk |
---|---|---|---|
Label | Incident Near Miss | ||
IRI | https://w3id.org/dpv/risk#IncidentNearMiss | ||
Type | rdfs:Class, skos:Concept, risk:IncidentStatus | ||
Broader/Parent types | risk:IncidentStatus → dpv:Status → dpv:Context | ||
Object of relation | dpv:hasContext, dpv:hasStatus | ||
Definition | The state where an incident was almost successful in taking place i.e. "it came very close" | ||
Date Created | 2024-02-14 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section INCIDENT-STATUS in RISK |
Term | IncidentNotice | Prefix | risk |
---|---|---|---|
Label | Incident Notice | ||
IRI | https://w3id.org/dpv/risk#IncidentNotice | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | dpv:Notice → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasNotice, dpv:hasOrganisationalMeasure, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Notice associated with an Incident | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | IncidentOngoing | Prefix | risk |
---|---|---|---|
Label | Incident Ongoing | ||
IRI | https://w3id.org/dpv/risk#IncidentOngoing | ||
Type | rdfs:Class, skos:Concept, risk:IncidentStatus | ||
Broader/Parent types | risk:IncidentStatus → dpv:Status → dpv:Context | ||
Object of relation | dpv:hasContext, dpv:hasStatus | ||
Definition | The incident is ongoing i.e. still active | ||
Date Created | 2024-02-14 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section INCIDENT-STATUS in RISK |
Term | IncidentOngoingReport | Prefix | risk |
---|---|---|---|
Label | Incident Ongoing Report | ||
IRI | https://w3id.org/dpv/risk#IncidentOngoingReport | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:IncidentReport → dpv:RecordsOfActivities → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasOrganisationalMeasure, dpv:hasRecordOfActivity, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A report describing on ongoing investigation regarding a Incident where facts and extent of the investigation are being investigated | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | IncidentPreliminaryReport | Prefix | risk |
---|---|---|---|
Label | Incident Preliminary Report | ||
IRI | https://w3id.org/dpv/risk#IncidentPreliminaryReport | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:IncidentReport → dpv:RecordsOfActivities → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasOrganisationalMeasure, dpv:hasRecordOfActivity, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A report describing the preliminary investigation regarding a Incident where the complete facts or extent of the incident may not be known | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | IncidentRegister | Prefix | risk |
---|---|---|---|
Label | Incident Register | ||
IRI | https://w3id.org/dpv/risk#IncidentRegister | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | dpv:RecordsOfActivities → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasOrganisationalMeasure, dpv:hasRecordOfActivity, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A register recording incidentes, their reports, notifications, and other related activities | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section INCIDENT in RISK |
Term | IncidentReport | Prefix | risk |
---|---|---|---|
Label | Incident Report | ||
IRI | https://w3id.org/dpv/risk#IncidentReport | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | dpv:RecordsOfActivities → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasOrganisationalMeasure, dpv:hasRecordOfActivity, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | Documented information about an incident, its handling, assessments,and notifications | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | IncidentStatus | Prefix | risk |
---|---|---|---|
Label | Incident Status | ||
IRI | https://w3id.org/dpv/risk#IncidentStatus | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | dpv:Status → dpv:Context | ||
Object of relation | dpv:hasContext, dpv:hasStatus | ||
Definition | Status associated with an incident | ||
Examples | dex:E0069 :: Using DPV and RISK extension to represent incidents |
||
Date Created | 2024-02-14 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section INCIDENT-STATUS in DEX |
Term | IncidentStatusUnknown | Prefix | risk |
---|---|---|---|
Label | Incident Status Unknown | ||
IRI | https://w3id.org/dpv/risk#IncidentStatusUnknown | ||
Type | rdfs:Class, skos:Concept, risk:IncidentStatus | ||
Broader/Parent types | risk:IncidentStatus → dpv:Status → dpv:Context | ||
Object of relation | dpv:hasContext, dpv:hasStatus | ||
Definition | The status of a incident is unknown | ||
Date Created | 2024-02-14 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section INCIDENT-STATUS in RISK |
Term | IncidentSuspected | Prefix | risk |
---|---|---|---|
Label | Incident Suspected | ||
IRI | https://w3id.org/dpv/risk#IncidentSuspected | ||
Type | rdfs:Class, skos:Concept, risk:IncidentStatus | ||
Broader/Parent types | risk:IncidentStatus → dpv:Status → dpv:Context | ||
Object of relation | dpv:hasContext, dpv:hasStatus | ||
Definition | The state where a incident is suspected, but has not yet been confirmed. This can be due to lack of information, or because the process of detection and investigation is still ongoing | ||
Date Created | 2024-02-14 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section INCIDENT-STATUS in RISK |
Term | IncidentSuspectedReport | Prefix | risk |
---|---|---|---|
Label | Incident Suspected Report | ||
IRI | https://w3id.org/dpv/risk#IncidentSuspectedReport | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:IncidentReport → dpv:RecordsOfActivities → dpv:OrganisationalMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasOrganisationalMeasure, dpv:hasRecordOfActivity, dpv:hasTechnicalOrganisationalMeasure | ||
Definition | A report describing the suspicion of an incident in the past or occuring | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | IncidentTerminated | Prefix | risk |
---|---|---|---|
Label | Incident Terminated | ||
IRI | https://w3id.org/dpv/risk#IncidentTerminated | ||
Type | rdfs:Class, skos:Concept, risk:IncidentStatus | ||
Broader/Parent types | risk:IncidentStatus → dpv:Status → dpv:Context | ||
Object of relation | dpv:hasContext, dpv:hasStatus | ||
Definition | The incident has been stopped or terminated through the use of a mitigation or deterrent measure with a low likelihood of resuming or recurring | ||
Date Created | 2024-02-14 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section INCIDENT-STATUS in RISK |
Term | IncreaseInternalCost | Prefix | risk |
---|---|---|---|
Label | Increase Internal Cost | ||
IRI | https://w3id.org/dpv/risk#IncreaseInternalCost | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Increase Internal Cost | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | IndustrialCrisis | Prefix | risk |
---|---|---|---|
Label | Industrial Crisis | ||
IRI | https://w3id.org/dpv/risk#IndustrialCrisis | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Industrial Crisis | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | Injury | Prefix | risk |
---|---|---|---|
Label | Injury | ||
IRI | https://w3id.org/dpv/risk#Injury | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Injury | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | IntegrityIncident | Prefix | risk |
---|---|---|---|
Label | Integrity Incident | ||
IRI | https://w3id.org/dpv/risk#IntegrityIncident | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:Incident | ||
Object of relation | risk:hasIncident | ||
Definition | Incident where the integrity of information or system has been affected | ||
Date Created | 2024-05-19 | ||
See More: | section INCIDENT in RISK |
Term | InterceptionCommunications | Prefix | risk |
---|---|---|---|
Label | Interception of Communications | ||
IRI | https://w3id.org/dpv/risk#InterceptionCommunications | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Interception of Communications | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | InternalOperationDisruption | Prefix | risk |
---|---|---|---|
Label | Internal Operation Disruption | ||
IRI | https://w3id.org/dpv/risk#InternalOperationDisruption | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Internal Operation Disruption | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | KnownVulnerabilityExploited | Prefix | risk |
---|---|---|---|
Label | Known Vulnerability Exploited | ||
IRI | https://w3id.org/dpv/risk#KnownVulnerabilityExploited | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Known Vulnerability Exploited | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LawEnforcementAdverseEffects | Prefix | risk |
---|---|---|---|
Label | Law Enforcement Adverse Effects | ||
IRI | https://w3id.org/dpv/risk#LawEnforcementAdverseEffects | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Law Enforcement Adverse Effects | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LimitationOfRights | Prefix | risk |
---|---|---|---|
Label | Limitation of Rights | ||
IRI | https://w3id.org/dpv/risk#LimitationOfRights | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Limitation of Rights | ||
Date Created | 2022-08-18 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossAssets | Prefix | risk |
---|---|---|---|
Label | Loss of Assets | ||
IRI | https://w3id.org/dpv/risk#LossAssets | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:MaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Assets | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossCompetitiveAdvantage | Prefix | risk |
---|---|---|---|
Label | Loss of Competitive Advantage | ||
IRI | https://w3id.org/dpv/risk#LossCompetitiveAdvantage | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Competitive Advantage | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossControlOverData | Prefix | risk |
---|---|---|---|
Label | Loss of Control over Data | ||
IRI | https://w3id.org/dpv/risk#LossControlOverData | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Control over Data | ||
Date Created | 2022-08-19 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossCredibility | Prefix | risk |
---|---|---|---|
Label | Loss of Credibility | ||
IRI | https://w3id.org/dpv/risk#LossCredibility | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Credibility | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossCustomerConfidence | Prefix | risk |
---|---|---|---|
Label | Loss of Customer Confidence | ||
IRI | https://w3id.org/dpv/risk#LossCustomerConfidence | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Customer Confidence | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossCustomers | Prefix | risk |
---|---|---|---|
Label | Loss of Customers | ||
IRI | https://w3id.org/dpv/risk#LossCustomers | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Customers | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossData | Prefix | risk |
---|---|---|---|
Label | Loss of Data | ||
IRI | https://w3id.org/dpv/risk#LossData | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Data | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossFunds | Prefix | risk |
---|---|---|---|
Label | Loss of Funds | ||
IRI | https://w3id.org/dpv/risk#LossFunds | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:MaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Funds | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossGoods | Prefix | risk |
---|---|---|---|
Label | Loss of Goods | ||
IRI | https://w3id.org/dpv/risk#LossGoods | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:MaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Goods | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossGoodwill | Prefix | risk |
---|---|---|---|
Label | Loss of Goodwill | ||
IRI | https://w3id.org/dpv/risk#LossGoodwill | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Goodwill | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossNegotiatingCapacity | Prefix | risk |
---|---|---|---|
Label | Loss of Negotiating Capacity | ||
IRI | https://w3id.org/dpv/risk#LossNegotiatingCapacity | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Negotiating Capacity | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossOpportunity | Prefix | risk |
---|---|---|---|
Label | Loss of Opportunity | ||
IRI | https://w3id.org/dpv/risk#LossOpportunity | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Opportunity | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossProprietaryInformation | Prefix | risk |
---|---|---|---|
Label | Loss of Proprietary Information | ||
IRI | https://w3id.org/dpv/risk#LossProprietaryInformation | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Proprietary Information | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossReputation | Prefix | risk |
---|---|---|---|
Label | Loss of Reputation | ||
IRI | https://w3id.org/dpv/risk#LossReputation | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Reputation | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossResources | Prefix | risk |
---|---|---|---|
Label | Loss of Resources | ||
IRI | https://w3id.org/dpv/risk#LossResources | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Resources | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossSuppliers | Prefix | risk |
---|---|---|---|
Label | Loss of Suppliers | ||
IRI | https://w3id.org/dpv/risk#LossSuppliers | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Suppliers | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossTechnologicalAdvantage | Prefix | risk |
---|---|---|---|
Label | Loss of Technological Advantage | ||
IRI | https://w3id.org/dpv/risk#LossTechnologicalAdvantage | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Technological Advantage | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LossTrust | Prefix | risk |
---|---|---|---|
Label | Loss of Trust | ||
IRI | https://w3id.org/dpv/risk#LossTrust | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Loss of Trust | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | LowLikelihood | Prefix | risk |
---|---|---|---|
Label | Low Likelihood | ||
IRI | https://w3id.org/dpv/risk#LowLikelihood | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | risk:3LikelihoodLevels → dpv:Likelihood | ||
Broader/Parent types | risk:5LikelihoodLevels → dpv:Likelihood | ||
Broader/Parent types | risk:7LikelihoodLevels → dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Level where Likelihood is Low | ||
Usage Note | The suggested quantitative value for this concept is 0.25 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | LowRisk | Prefix | risk |
---|---|---|---|
Label | Low Risk | ||
IRI | https://w3id.org/dpv/risk#LowRisk | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | risk:3RiskLevels → dpv:RiskLevel | ||
Broader/Parent types | risk:5RiskLevels → dpv:RiskLevel | ||
Broader/Parent types | risk:7RiskLevels → dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Level where Risk is Low | ||
Usage Note | The suggested quantitative value for this concept is 0.25 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | LowSeverity | Prefix | risk |
---|---|---|---|
Label | Low Severity | ||
IRI | https://w3id.org/dpv/risk#LowSeverity | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | risk:3SeverityLevels → dpv:Severity | ||
Broader/Parent types | risk:5SeverityLevels → dpv:Severity | ||
Broader/Parent types | risk:7SeverityLevels → dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Level where Severity is Low | ||
Usage Note | The suggested quantitative value for this concept is 0.25 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | MaliciousCodeAttack | Prefix | risk |
---|---|---|---|
Label | Malicious Code Attack | ||
IRI | https://w3id.org/dpv/risk#MaliciousCodeAttack | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Intentional use of software by including or inserting in a system for a harmful purpose | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | MalwareAttack | Prefix | risk |
---|---|---|---|
Label | Malware Attack | ||
IRI | https://w3id.org/dpv/risk#MalwareAttack | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Malware is software or firmware intended to perform an unauthorised process that will have an adverse impact on the confidentiality, integrity, or availability of a system | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | MaterialDamage | Prefix | risk |
---|---|---|---|
Label | Material Damage | ||
IRI | https://w3id.org/dpv/risk#MaterialDamage | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Impact that acts as or causes material damages | ||
Date Created | 2022-03-30 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | MisinformationDisinformation | Prefix | risk |
---|---|---|---|
Label | Misinformation and Disinformation | ||
IRI | https://w3id.org/dpv/risk#MisinformationDisinformation | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Information that is untrue, misleading, or false and used intentionally (disinformation) or unintentionally (misinformation) | ||
Source | ENISA Threat Landscape 2021 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | Misuse | Prefix | risk |
---|---|---|---|
Label | Misuse | ||
IRI | https://w3id.org/dpv/risk#Misuse | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Misuse | ||
Date Created | 2024-06-11 | ||
Contributors | Delaram Golpayegani | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | MisuseBreachedInformation | Prefix | risk |
---|---|---|---|
Label | Misuse of Breached Information | ||
IRI | https://w3id.org/dpv/risk#MisuseBreachedInformation | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Misuse of Breached Information | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | ModerateLikelihood | Prefix | risk |
---|---|---|---|
Label | Moderate Likelihood | ||
IRI | https://w3id.org/dpv/risk#ModerateLikelihood | ||
Type | rdfs:Class, skos:Concept, dpv:Likelihood | ||
Broader/Parent types | risk:3LikelihoodLevels → dpv:Likelihood | ||
Broader/Parent types | risk:5LikelihoodLevels → dpv:Likelihood | ||
Broader/Parent types | risk:7LikelihoodLevels → dpv:Likelihood | ||
Object of relation | dpv:hasLikelihood | ||
Definition | Level where Likelihood is Moderate | ||
Usage Note | The suggested quantitative value for this concept is 0.5 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | ModerateRisk | Prefix | risk |
---|---|---|---|
Label | Moderate Risk | ||
IRI | https://w3id.org/dpv/risk#ModerateRisk | ||
Type | rdfs:Class, skos:Concept, dpv:RiskLevel | ||
Broader/Parent types | risk:3RiskLevels → dpv:RiskLevel | ||
Broader/Parent types | risk:5RiskLevels → dpv:RiskLevel | ||
Broader/Parent types | risk:7RiskLevels → dpv:RiskLevel | ||
Object of relation | dpv:hasRiskLevel | ||
Definition | Level where Risk is Moderate | ||
Usage Note | The suggested quantitative value for this concept is 0.5 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | ModerateSeverity | Prefix | risk |
---|---|---|---|
Label | Moderate Severity | ||
IRI | https://w3id.org/dpv/risk#ModerateSeverity | ||
Type | rdfs:Class, skos:Concept, dpv:Severity | ||
Broader/Parent types | risk:3SeverityLevels → dpv:Severity | ||
Broader/Parent types | risk:5SeverityLevels → dpv:Severity | ||
Broader/Parent types | risk:7SeverityLevels → dpv:Severity | ||
Object of relation | dpv:hasSeverity | ||
Definition | Level where Severity is Moderate | ||
Usage Note | The suggested quantitative value for this concept is 0.5 on a scale of 0 to 1 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-LEVELS in RISK |
Term | MonitorConsequence | Prefix | risk |
---|---|---|---|
Label | Monitor Consequence | ||
IRI | https://w3id.org/dpv/risk#MonitorConsequence | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:MonitorControl → risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that monitors a Risk Consequence | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | MonitorControl | Prefix | risk |
---|---|---|---|
Label | Monitor Control | ||
IRI | https://w3id.org/dpv/risk#MonitorControl | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Risk Mitigation Measure that uses controls to monitor events | ||
Usage Note | Monitoring can be associated with characteristics such as assessing or detecting whether something is active, operational, performant, effective, has potential to materialise, is materialising, or has already materialised. | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | MonitorImpact | Prefix | risk |
---|---|---|---|
Label | Monitor Impact | ||
IRI | https://w3id.org/dpv/risk#MonitorImpact | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:MonitorControl → risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that monitors a Risk Impact | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | MonitorRisk | Prefix | risk |
---|---|---|---|
Label | Monitor Risk | ||
IRI | https://w3id.org/dpv/risk#MonitorRisk | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:MonitorControl → risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that monitors a Risk | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | MonitorRiskControl | Prefix | risk |
---|---|---|---|
Label | Monitor Control | ||
IRI | https://w3id.org/dpv/risk#MonitorRiskControl | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:MonitorControl → risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that monitors another Control | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | MonitorRiskSource | Prefix | risk |
---|---|---|---|
Label | Monitor Risk Source | ||
IRI | https://w3id.org/dpv/risk#MonitorRiskSource | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:MonitorControl → risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that monitors a Risk Source | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | MonitorVulnerabilities | Prefix | risk |
---|---|---|---|
Label | Monitor Vulnerabilities | ||
IRI | https://w3id.org/dpv/risk#MonitorVulnerabilities | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:MonitorControl → risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that monitors a Risk Vulnerability | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | NonMaterialDamage | Prefix | risk |
---|---|---|---|
Label | Non-Material Damage | ||
IRI | https://w3id.org/dpv/risk#NonMaterialDamage | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Impact that acts as or causes non-material damages | ||
Date Created | 2022-03-30 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | OrganisationDisruption | Prefix | risk |
---|---|---|---|
Label | Organisation Disruption | ||
IRI | https://w3id.org/dpv/risk#OrganisationDisruption | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Organisation Disruption | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | Payment | Prefix | risk |
---|---|---|---|
Label | Payment | ||
IRI | https://w3id.org/dpv/risk#Payment | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | risk:Compensation → risk:Benefit → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Definition | Payment provided as compensation (as an impact) | ||
Date Created | 2024-04-14 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | PersonalSafetyEndangerment | Prefix | risk |
---|---|---|---|
Label | Personal Safety Endangerment | ||
IRI | https://w3id.org/dpv/risk#PersonalSafetyEndangerment | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Personal Safety Endangerment | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | PersonnelAbsence | Prefix | risk |
---|---|---|---|
Label | Personnel Absence | ||
IRI | https://w3id.org/dpv/risk#PersonnelAbsence | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Personnel Absence | ||
Source | ENISA Threat Taxonomy 2016 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | PhishingScam | Prefix | risk |
---|---|---|---|
Label | Phishing Scam | ||
IRI | https://w3id.org/dpv/risk#PhishingScam | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | A type of social engineering attack involving deceptive messages intended to reveal sensitive information | ||
Source | ENISA Threat Landscape for Ransomware Attacks 2022 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | PhysicalAssault | Prefix | risk |
---|---|---|---|
Label | Physical Assault | ||
IRI | https://w3id.org/dpv/risk#PhysicalAssault | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Physical Assault | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | PhysicalSpying | Prefix | risk |
---|---|---|---|
Label | Physical Spying | ||
IRI | https://w3id.org/dpv/risk#PhysicalSpying | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Physical Spying | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | PhysicalStalking | Prefix | risk |
---|---|---|---|
Label | Physical Stalking | ||
IRI | https://w3id.org/dpv/risk#PhysicalStalking | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Physical Stalking | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | PreventExercisingOfRights | Prefix | risk |
---|---|---|---|
Label | Prevent Exercising of Rights | ||
IRI | https://w3id.org/dpv/risk#PreventExercisingOfRights | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Prevent Exercising of Rights | ||
Date Created | 2022-08-18 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | PrivacyImpact | Prefix | risk |
---|---|---|---|
Label | Privacy impact | ||
IRI | https://w3id.org/dpv/risk#PrivacyImpact | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Privacy impact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | PsychologicalHarm | Prefix | risk |
---|---|---|---|
Label | Psychological Harm | ||
IRI | https://w3id.org/dpv/risk#PsychologicalHarm | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Harm → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Psychological Harm | ||
Source | ENISA Reference Incident Classification Taxonomy 2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | PublicOrderBreach | Prefix | risk |
---|---|---|---|
Label | Public Order Breach | ||
IRI | https://w3id.org/dpv/risk#PublicOrderBreach | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Public Order Breach | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | RansomwareAttack | Prefix | risk |
---|---|---|---|
Label | Ransomware Attack | ||
IRI | https://w3id.org/dpv/risk#RansomwareAttack | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Ransomware is a type of attack where threat actors take control of a target’s assets and demand a ransom in exchange for the return of the asset’s availability and confidentiality | ||
Source | ENISA Threat Landscape for Ransomware Attacks 2022, ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | RecoveryControl | Prefix | risk |
---|---|---|---|
Label | Recovery Control | ||
IRI | https://w3id.org/dpv/risk#RecoveryControl | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control to recover from event | ||
Date Created | 2024-05-19 | ||
See More: | section RISK-CONTROLS in RISK |
Term | ReduceLikelihood | Prefix | risk |
---|---|---|---|
Label | Reduce Likelihood | ||
IRI | https://w3id.org/dpv/risk#ReduceLikelihood | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:ReductionControl → risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that reduces the likelihood of an event | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | ReduceSeverity | Prefix | risk |
---|---|---|---|
Label | Reduce Severity | ||
IRI | https://w3id.org/dpv/risk#ReduceSeverity | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:ReductionControl → risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that reduces the severity of an event | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | ReductionControl | Prefix | risk |
---|---|---|---|
Label | Reduction Control | ||
IRI | https://w3id.org/dpv/risk#ReductionControl | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that reduces the likelihood or severity of an event | ||
Date Created | 2024-05-19 | ||
See More: | section RISK-CONTROLS in RISK |
Term | Reidentification | Prefix | risk |
---|---|---|---|
Label | Re-identification | ||
IRI | https://w3id.org/dpv/risk#Reidentification | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Re-identification | ||
Date Created | 2022-08-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | RemedyControl | Prefix | risk |
---|---|---|---|
Label | Remedy Control | ||
IRI | https://w3id.org/dpv/risk#RemedyControl | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control to remedy consequences of event | ||
Date Created | 2024-05-19 | ||
See More: | section RISK-CONTROLS in RISK |
Term | RemoteSpying | Prefix | risk |
---|---|---|---|
Label | Remote Spying | ||
IRI | https://w3id.org/dpv/risk#RemoteSpying | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:NonMaterialDamage → risk:Damage → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Remote Spying | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | RemoveConsequence | Prefix | risk |
---|---|---|---|
Label | Remove Consequence | ||
IRI | https://w3id.org/dpv/risk#RemoveConsequence | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:ConsequenceControl → risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that removes Consequence i.e. prevents it from materialising | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | RemoveImpact | Prefix | risk |
---|---|---|---|
Label | Remove Impact | ||
IRI | https://w3id.org/dpv/risk#RemoveImpact | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:ImpactControl → risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that removes Impact i.e. prevents it from materialising | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | RemoveSource | Prefix | risk |
---|---|---|---|
Label | Remove Source | ||
IRI | https://w3id.org/dpv/risk#RemoveSource | ||
Type | rdfs:Class, skos:Concept, risk:RiskControl | ||
Broader/Parent types | risk:SourceControl → risk:RiskControl → dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that removes the risk source | ||
Date Created | 2024-05-19 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONTROLS in RISK |
Term | Renumeration | Prefix | risk |
---|---|---|---|
Label | Remuneration | ||
IRI | https://w3id.org/dpv/risk#Renumeration | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | risk:Compensation → risk:Benefit → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Definition | Renumeration provided as compensation (as an impact) | ||
Date Created | 2024-04-14 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | ReplacementCosts | Prefix | risk |
---|---|---|---|
Label | Replacement Costs | ||
IRI | https://w3id.org/dpv/risk#ReplacementCosts | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Replacement Costs | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | ReputationTrustImpact | Prefix | risk |
---|---|---|---|
Label | Reputation and trust impact | ||
IRI | https://w3id.org/dpv/risk#ReputationTrustImpact | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Reputation and trust impact | ||
Source | ENISA Methodology for Sectoral Cybersecurity Assessments | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | RetrievalDeletedData | Prefix | risk |
---|---|---|---|
Label | Retrieval of Deleted Data | ||
IRI | https://w3id.org/dpv/risk#RetrievalDeletedData | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Retrieval of Deleted Data | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | RetrievalDiscardedEquipment | Prefix | risk |
---|---|---|---|
Label | Retrieval of Discarded Equipment | ||
IRI | https://w3id.org/dpv/risk#RetrievalDiscardedEquipment | ||
Type | rdfs:Class, skos:Concept, dpv:Risk | ||
Broader/Parent types | risk:Detriment → dpv:Risk | ||
Subject of relation | dpv:hasResidualRisk, dpv:hasRiskLevel, dpv:isMitigatedByMeasure, risk:hasRiskSource | ||
Object of relation | dpv:hasRisk, dpv:isResidualRiskOf, dpv:mitigatesRisk, risk:refersToRisk | ||
Definition | Retrieval of Discarded Equipment | ||
Source | ISO/IEC 27005:2018 | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | Reward | Prefix | risk |
---|---|---|---|
Label | Reward | ||
IRI | https://w3id.org/dpv/risk#Reward | ||
Type | rdfs:Class, skos:Concept, dpv:Impact | ||
Broader/Parent types | risk:Compensation → risk:Benefit → dpv:Impact → dpv:Consequence | ||
Subject of relation | dpv:hasImpactOn | ||
Object of relation | dpv:hasConsequence, dpv:hasImpact | ||
Definition | Reward provided as compensation (as an impact) | ||
Date Created | 2024-04-14 | ||
Contributors | Georg P. Krog, Harshvardhan J. Pandit | ||
See More: | section RISK-CONSEQUENCES in RISK |
Term | RiskAnalysis | Prefix | risk |
---|---|---|---|
Label | Risk Analysis | ||
IRI | https://w3id.org/dpv/risk#RiskAnalysis | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:RiskAssessment → risk:RiskManagement | ||
Definition | A technique or method used to analyse and identify risk levels, sources, likelihoods, severities, and other necessary information required to conduct risk management procedures | ||
Source | IEC 31010:2019 | ||
Date Created | 2022-08-18 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section CORE in RISK |
Term | RiskAssessment | Prefix | risk |
---|---|---|---|
Label | Risk Assessment | ||
IRI | https://w3id.org/dpv/risk#RiskAssessment | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | risk:RiskManagement | ||
Definition | Assessment of risk involving its identification, analysis, and evaluation | ||
Source | |||
Date Created | 2024-02-14 | ||
See More: | section CORE in RISK |
Term | RiskControl | Prefix | risk |
---|---|---|---|
Label | Risk Control | ||
IRI | https://w3id.org/dpv/risk#RiskControl | ||
Type | rdfs:Class, skos:Concept | ||
Broader/Parent types | dpv:RiskMitigationMeasure → dpv:TechnicalOrganisationalMeasure | ||
Object of relation | dpv:hasTechnicalOrganisationalMeasure, dpv:isMitigatedByMeasure, risk:hasControl | ||
Definition | Control that modifies risk | ||
Examples | dex:E0071 :: Using risk controls to express how tech/org measures address the risk |
||
Date Created | 2024-05-19 | ||
See More: | section RISK-CONTROLS in DEX |
Term | RiskManagement | Prefix | risk |
---|---|---|---|
Label | Risk Management | ||
IRI | https://w3id.org/dpv/risk#RiskManagement | ||
Type | rdfs:Class, skos:Concept | ||
Definition | Systematic application of management policies, procedures, and practices for communicating, consulting, establishing context, and identifying, analysing, evaluating, treating, monitoring and reviewing risk. ISO 31000 definition: coordinated activities to direct and control an organization with regard to risk | ||
Source | |||
Date Created | 2024-06-12 | ||
See More: | section CORE in RISK |
Term | RiskMatrix | Prefix | risk |
---|---|---|---|
Label | Risk Matrix | ||
IRI | https://w3id.org/dpv/risk#RiskMatrix | ||
Type | rdfs:Class, skos:Concept, risk:RiskAssessment | ||
Broader/Parent types | risk:RiskAssessment → risk:RiskManagement | ||
Definition | Compares individual risks by selecting a consequence/ likelihood pair and displaying them on a matrix with consequence on one axis and likelihood on the other. | ||
Source | IEC 31010:2019 | ||
Date Created | 2024-02-14 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section CORE in RISK |
Term | RiskMatrix3x3 | Prefix | risk |
---|---|---|---|
Label | Risk Matrix 3x3 | ||
IRI | https://w3id.org/dpv/risk#RiskMatrix3x3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | A Risk Matrix with 3 Likelihood, 3 Severity, and 3 Risk Level types | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RiskMatrix5x5 | Prefix | risk |
---|---|---|---|
Label | Risk Matrix 5x5 | ||
IRI | https://w3id.org/dpv/risk#RiskMatrix5x5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | A Risk Matrix with 5 Likelihood, 5 Severity, and 5 Risk Level types | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RiskMatrix7x7 | Prefix | risk |
---|---|---|---|
Label | Risk Matrix 7x7 | ||
IRI | https://w3id.org/dpv/risk#RiskMatrix7x7 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | A Risk Matrix with 7 Likelihood, 7 Severity, and 7 Risk Level types | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RiskSource | Prefix | risk |
---|---|---|---|
Label | Risk Source | ||
IRI | https://w3id.org/dpv/risk#RiskSource | ||
Type | rdfs:Class, skos:Concept | ||
Object of relation | risk:hasRiskSource | ||
Definition | The 'cause' or 'source', which by itself or with another source has the potential to give rise to risk | ||
Date Created | 2024-02-14 | ||
See More: | section CORE in RISK |
Term | RM3x3S1L1 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM3x3 S:1 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S1L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: Low; Likelihood: Low; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM3x3S1L2 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM3x3 S:1 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S1L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: Low; Likelihood: Moderate; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM3x3S1L3 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM3x3 S:1 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S1L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: Low; Likelihood: High; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM3x3S2L1 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM3x3 S:2 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S2L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: Moderate; Likelihood: Low; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM3x3S2L2 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM3x3 S:2 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S2L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: Moderate; Likelihood: Moderate; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM3x3S2L3 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM3x3 S:2 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S2L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: Moderate; Likelihood: High; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM3x3S3L1 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM3x3 S:3 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S3L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: High; Likelihood: Low; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM3x3S3L2 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM3x3 S:3 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S3L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: High; Likelihood: Moderate; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM3x3S3L3 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM3x3 S:3 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM3x3S3L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix3x3 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 3x3 Risk Matrix with Risk Severity: High; Likelihood: High; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S1L1 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM5x5 S:1 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S1L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Very Low; Likelihood: Very Low; and Risk Level: Very Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S1L2 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM5x5 S:1 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S1L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Very Low; Likelihood: Low; and Risk Level: Very Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S1L3 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM5x5 S:1 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S1L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Very Low; Likelihood: Moderate; and Risk Level: Very Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S1L4 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM5x5 S:1 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S1L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Very Low; Likelihood: High; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S1L5 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM5x5 S:1 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S1L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Very Low; Likelihood: Very High; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S2L1 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM5x5 S:2 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S2L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Low; Likelihood: Very Low; and Risk Level: Very Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S2L2 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM5x5 S:2 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S2L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Low; Likelihood: Low; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S2L3 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM5x5 S:2 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S2L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Low; Likelihood: Moderate; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S2L4 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM5x5 S:2 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S2L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Low; Likelihood: High; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S2L5 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM5x5 S:2 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S2L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Low; Likelihood: Very High; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S3L1 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM5x5 S:3 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S3L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Moderate; Likelihood: Very Low; and Risk Level: Very Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S3L2 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM5x5 S:3 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S3L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Moderate; Likelihood: Low; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S3L3 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM5x5 S:3 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S3L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Moderate; Likelihood: Moderate; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S3L4 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM5x5 S:3 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S3L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Moderate; Likelihood: High; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S3L5 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM5x5 S:3 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S3L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Moderate; Likelihood: Very High; and Risk Level: Very High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S4L1 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM5x5 S:4 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S4L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: High; Likelihood: Very Low; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S4L2 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM5x5 S:4 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S4L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: High; Likelihood: Low; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S4L3 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM5x5 S:4 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S4L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: High; Likelihood: Moderate; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S4L4 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM5x5 S:4 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S4L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: High; Likelihood: High; and Risk Level: Very High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S4L5 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM5x5 S:4 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S4L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: High; Likelihood: Very High; and Risk Level: Very High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S5L1 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM5x5 S:5 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S5L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Very High; Likelihood: Very Low; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S5L2 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM5x5 S:5 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S5L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Very High; Likelihood: Low; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S5L3 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM5x5 S:5 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S5L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Very High; Likelihood: Moderate; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S5L4 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM5x5 S:5 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S5L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Very High; Likelihood: High; and Risk Level: Very High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM5x5S5L5 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM5x5 S:5 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM5x5S5L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix5x5 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 5x5 Risk Matrix with Risk Severity: Very High; Likelihood: Very High; and Risk Level: Very High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S1L1 | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk (RM7x7 S:1 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S1L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Extremely Low; Likelihood: Extremely Low; and Risk Level: Extremely Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S1L2 | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk (RM7x7 S:1 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S1L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Extremely Low; Likelihood: Very Low; and Risk Level: Extremely Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S1L3 | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk (RM7x7 S:1 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S1L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Extremely Low; Likelihood: Low; and Risk Level: Extremely Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S1L4 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM7x7 S:1 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S1L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Extremely Low; Likelihood: Moderate; and Risk Level: Very Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S1L5 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM7x7 S:1 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S1L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Extremely Low; Likelihood: High; and Risk Level: Very Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S1L6 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM7x7 S:1 L:6) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S1L6 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Extremely Low; Likelihood: Very High; and Risk Level: Very Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S1L7 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM7x7 S:1 L:7) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S1L7 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Extremely Low; Likelihood: Extremely High; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S2L1 | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk (RM7x7 S:2 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S2L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Very Low; Likelihood: Extremely Low; and Risk Level: Extremely Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S2L2 | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk (RM7x7 S:2 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S2L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Very Low; Likelihood: Very Low; and Risk Level: Extremely Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S2L3 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM7x7 S:2 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S2L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Very Low; Likelihood: Low; and Risk Level: Very Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S2L4 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM7x7 S:2 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S2L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Very Low; Likelihood: Moderate; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S2L5 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM7x7 S:2 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S2L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Very Low; Likelihood: High; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S2L6 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM7x7 S:2 L:6) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S2L6 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Very Low; Likelihood: Very High; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S2L7 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM7x7 S:2 L:7) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S2L7 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Very Low; Likelihood: Extremely High; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S3L1 | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk (RM7x7 S:3 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S3L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Low; Likelihood: Extremely Low; and Risk Level: Extremely Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S3L2 | Prefix | risk |
---|---|---|---|
Label | Very Low Risk (RM7x7 S:3 L:2) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S3L2 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Low; Likelihood: Very Low; and Risk Level: Very Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S3L3 | Prefix | risk |
---|---|---|---|
Label | Low Risk (RM7x7 S:3 L:3) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S3L3 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Low; Likelihood: Low; and Risk Level: Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S3L4 | Prefix | risk |
---|---|---|---|
Label | Moderate Risk (RM7x7 S:3 L:4) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S3L4 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Low; Likelihood: Moderate; and Risk Level: Moderate | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S3L5 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM7x7 S:3 L:5) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S3L5 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Low; Likelihood: High; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S3L6 | Prefix | risk |
---|---|---|---|
Label | High Risk (RM7x7 S:3 L:6) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S3L6 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Low; Likelihood: Very High; and Risk Level: High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S3L7 | Prefix | risk |
---|---|---|---|
Label | Very High Risk (RM7x7 S:3 L:7) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S3L7 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Low; Likelihood: Extremely High; and Risk Level: Very High | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |
Term | RM7x7S4L1 | Prefix | risk |
---|---|---|---|
Label | Extremely Low Risk (RM7x7 S:4 L:1) | ||
IRI | https://w3id.org/dpv/risk#RM7x7S4L1 | ||
Type | rdfs:Class, skos:Concept, risk:RiskAnalysis | ||
Broader/Parent types | risk:RiskMatrix7x7 → risk:RiskMatrix → risk:RiskAssessment → risk:RiskManagement | ||
Definition | Node in a 7x7 Risk Matrix with Risk Severity: Moderate; Likelihood: Extremely Low; and Risk Level: Extremely Low | ||
Date Created | 2022-08-17 | ||
Contributors | Harshvardhan J. Pandit | ||
See More: | section RISK-MATRIX in RISK |