BEMS Retrofit
Appearance
- Title: BEMS Retrofitting
- Description: Retrofitting of the building and the HVAC equipment and the parametrization of the BEMS.
- Data Domain(s): Building product, Building Devices, Building Data, Building Communication
- Objectives: Performing retrofitting based on the experiences of the operating phase or in case that the HVAC equipment does not fulfill technical, economic, or comfort requirements
- Stakeholders: Facility Manager, Building Owner, Automation Engineer/HVAC Engineer/Architect/Cost Manager/Energy Analyst
- Requirements:
- Suggestion from facility manager
- Approval from building owner
- LD Benefits:
- data integration from different sources
- common vocabularies
- Challenges
- integrating data on-demand;
- Solution Occurs in BLC Stage: Retrofitting/Refurbishment/Reconfiguration
- Uses Data Generated During BLC Stage: Operation
- Data Standards Used: IFC
- Associated Projects: SEEDS Project
- External source(s):
- Use Case Description in BIM*Q Tool: http://85.10.201.48:4590/en/contexts/29/templates/1
- Wiki contributors: Hendro Wicaksono (KIT)