W3C | TAG | Previous: 18 Aug
teleconf | Next: 15 Sep 2003 teleconf
Agenda of 8 September 2003 TAG teleconference
Nearby: Teleconference details · issues list (handling new
issues)· www-tag
archive
Note: The Chair does not expect the agenda to change
after close of business (Boston time) Thursday of this week.
1. Administrative (15min)
- Roll call. Regrets: RF, DC, IJ, TBL. Scribe?
- Accept the minutes of the 18
Aug teleconf?
- Accept this agenda?
- Next meeting 15 Sep teleconf?
1.1 Scheduling
Completed action SW 2003/08/18: Review work plan from Vancouver F2F
to help with schedule (done)
See below for information about
Arch Doc scheduling.
1.2 Bristol meeting planning (6 - 8 Oct)
See meeting page for
information about suggested hotels.
Completed action SW 2003/08/18: Suggest hotel (done)
2. Technical (75min)
2.1 NamespaceDocument-8
Status of work on namespaceDocument-8.
- Action TB 2003/04/07: Prepare RDDL Note. Include in status section
that there is TAG consensus that RDDL is a suitable format for
representations of an XML namespace. Clean up messy section 4 of RDDL
draft and investigate and publish a canonical mapping to RDF. From 21
July ftf meeting, due 31 August.
- Action PC 2003/04/07: Prepare finding to answer this issue,
pointing to the RDDL Note. See comments
from Paul regarding TB theses. From 21 July ftf meeting, due 31
August.
- Refer to draft TAG opinion
from Tim Bray on the use of URNs for namespace names.
2.2 Versioning and extensibility
- Completed Action NW, DO 2003/08/21: Finding on extensibility, due 15 August
2003 (done)
2.3 Status of overdue action items
- Action RF 2003/06/02: Rewrite section 3. From 21 July ftf meeting,
due 18 August
- contentPresentation-26:
Action CL (and IJ from ftf meeting) 2003/06/02: Make available a draft finding on
content/presentation. From 21 July ftf meeting, revision due 8
August.
Findings:
2.4 Architecture Document
Reference draft: 1 August 2003
Editor's Draft of the Arch Doc
What is TAG's expectation of editor at this point? For example:
- IJ closes loop on introduction with TB, RF (DC?). There was discussion at the 18 Aug
teleconf about a rewrite
of the abstract and introduction
- Editor's draft 17 Sep
- Reviewed at 22 Sep TAG teleconf
- IJ incorporates comments, gets review from two TAG participants,
and requests 1 Oct TR publication
- New TR draft published 1 Oct
- TAG reviews 1 Oct draft for and at face-to-face meeting 6 Oct.
2.4.1 Review of actions related to Architecture Document
Open action items:
- Action RF 2003/06/02: Rewrite section 3. From 21 July ftf
meeting, due 18 August.
- Action IJ 2003/06/16: Attempt to incorporate relevant bits of "Conversations and
State" into section to be produced by RF.
- Action TBL 2003/07/14: Suggest changes to section about extensibility
related to "when to tunnel".
- Action CL 2003/07/21: Create an illustration of two resources, one
designated by URI without fragment, and one designated by same URI with
fragment...
- Action TB 2003/08/18: Bring some Vancouver ftf meeting photos to IJ
attention (of whiteboard, re: CL action about illustration of two
resources)
- Action IJ, CL 2003/07/21: Discuss and propose improved wording of
language regarding SVG spec in bulleted list in 2.5.1.
- Action TBL 2003/07/21: Propose a replacement to "URI persistence
...person's mailbox" in 2.6 and continue to revise TBL draft of section
2.6 based on TAG's 23 July discussion.
- Action DC 2003/07/21: Propose language for section 2.8.5 showing
examples of freenet and other systems.
- Action TB 2003/08/04: Write a definition of "XML-based"
- Action IJ 2003/08/04: s/machine-readable/something like: optimized for
processors, w/ defn that includes notion that it can be processed
unattended (by a person).
- Completed action NW 2003/08/04: Redraft 4.10.2 to include some good
practice notes (e.g., use namespaces!) (done)
- Completed action NW 2003/08/04: Rewrite para 4 of 4.10.4 (done)
- Action TB and CL 2003/07/21: Propose a replacement sentence in section
3.2.2.1 regarding advantages of text formats. IRC log of 18
Aug teleconf suggested done, but can't find evidence.
The following action items were follow-up from the 22 July face-to-face
meeting in Vancouver:
- Identification and resources
- TBL 2003/08/21: Write replacement text for Moby Dick example in
section 2.6 (on URI ambiguity). Is this done in TBL's
draft?
- Representations
- TB, IJ 2003/08/21: Integrate findings. What does this mean?
2.5 Findings
See also TAG findings home page.
2.5.1 Draft findings nearing closure
2.5.2 Draft findings that require more discussion
2.5.3 Expected new findings
- Action IJ 2003/06/09: Turn TB apple
story into a finding.
- Action PC: Finding on namespace documents, due 31 August 2003
2.6 Issues
The TAG does not expect to discuss these issues at this meeting.
Existing Issues:
2.3.5 Miscellaneous issues
- uriMediaType-9
- IANA appears to have responded to the spirit of this draft (see email
from Chris Lilley).What's required to close this issue?
- Action CL 2003/05/05: Propose CL's three changes to registration
process to Ned Freed. [What forum?]
- HTTPSubstrate-16
- Action RF 2003/02/06: Write a response to IESG asking whether the
Web services example in the SOAP 1.2 primer is intended to be
excluded from RFC 3205
- See message
from Larry Masinter w.r.t. Web services.
- xlinkScope-23
- See draft,
and SW
message to CG chairs.
- Action CL 2003/06/30: Ping the chairs of those groups asking for an
update on xlinkScope-23.
- binaryXML-30
- Action TB 2003/02/17: Write to www-tag with his thoughts on adding
to survey.
- Action IJ 2003/07/21: Add link from issues list binaryXML-30 to
upcoming workshop
- Next steps to finding? See summary
from Chris.
- xmlFunctions-34
- Action TBL 2003/02/06: State the issue with a reference to XML Core
work. See email
from TimBL capturing some of the issues.
- charmodReview-17
- Completed action IJ 2003/07/14: Move issue 17 to pending rather
than resolved.
- Completed action DC: Remind I18N WG of what we are expecting
regarding issue 17; send this on behalf of the TAG (Done
- Mail from DC to I18N WG in light of new Charmod draft
- rdfURIMeaning-39
- Completed Action DC 2003/08/18: Alert SWCG of this issues (done)
3. Other actions
- Action IJ 2003/02/06: Modify issues list to show that actions/pending
are orthogonal to decisions. PLH has put the issues list in production;
see the DOM
issues list.
Ian Jacobs for Stuart Williams and TimBL
Last modified: $Date: 2003/09/06 13:19:32 $