- Title: BEMS Commissioning
- Description: comission of HVAC system under control of the BEMS.
- Data Domain(s): Building product, Device, Building Data, Building Communication
- Objectives: To adjust the BEMS in such away that the operational requirements will be fulfilled
- Stakeholders: BEMS Engineer, Facility Manager
- Requirements:
- FM requirements: operational requirements for BAS and BEMS (sensor/actuator network, thermal comfort, indoor air quality, energy consumption and CO2 emission optimization)
- Instruction of facility manager (FM) to conduct the commissioning
- data integration from different sources
- integrating data on-demand;
- Solution Occurs in BLC Stage:
- Uses Data Generated During BLC Stage: Operation
- Data Standards Used: IFC
- Associated Projects: SEEDS Project
- External source(s):
- Use Case Description in BIM*Q Tool:
- Wiki contributors: Hendro Wicaksono (KIT)