Guide to Guideline 2.2 Level 1 Success Criterion 1

2.2 L1 SC1

Key terms and important concepts

activity where timing is essential

An activity where timing is essential is an activity where timing is part of the design of the activity. Removal of the time element would change the performance of the participants. Versions of the activity (e.g. test) that have no time basis or time-outs might be preferred and may be required for some venues but this would require a complete redesign of the activity (e.g. test) and may change the character and validation methodology and would therefore not fall under these guidelines.

Intent of this success criterion

NOTE: Placeholder for description of intent

Technology-Independent techniques for Guideline 2.2 L1 SC1

placeholder

Task:

placeholder

placeholder

Technology-Specific Techniques for Guideline 2.2 L1 SC1

NOTE: Placeholder

Benefits: How Guideline 2.2 L1 SC1 helps people with disabilities

NOTE: Placeholder for Benefits section

Examples of Guideline 2.2 L1 SC1

NOTE: Placeholder for examples

Related resources

NOTE: Placeholder for Resources section