Main Page
From MultilingualWeb-LT EC Project Wiki
(→Testing and Demonstration) |
(→Upcoming) |
||
| Line 73: | Line 73: | ||
* Phone call 14 January, [http://www.timeanddate.com/worldclock/fixedtime.html?iso=20130114T16 4 p.m. UTC] ([http://www.timeanddate.com/scripts/ics.php?type=utc&iso=20130114T16 ICS format]) | * Phone call 14 January, [http://www.timeanddate.com/worldclock/fixedtime.html?iso=20130114T16 4 p.m. UTC] ([http://www.timeanddate.com/scripts/ics.php?type=utc&iso=20130114T16 ICS format]) | ||
* Phone call 21 January, [http://www.timeanddate.com/worldclock/fixedtime.html?iso=20130121T16 4 p.m. UTC] ([http://www.timeanddate.com/scripts/ics.php?type=utc&iso=20130121T16 ICS format]) | * Phone call 21 January, [http://www.timeanddate.com/worldclock/fixedtime.html?iso=20130121T16 4 p.m. UTC] ([http://www.timeanddate.com/scripts/ics.php?type=utc&iso=20130121T16 ICS format]) | ||
| - | * [[PragueJan2013f2f]] | + | * 24-24 January: [[PragueJan2013f2f]] |
==Past== | ==Past== | ||
Revision as of 13:34, 26 November 2012
Contents |
1 MultilingualWeb-LT Working Group Wiki
Name of the underlying EU project: LT-Web, see http://cordis.europa.eu/fp7/ict/language-technologies/project-multilingualweb-lt_en.html for details.
2 General links
- W3C telephone conference, IRC, tracking of issues and action items (for people new to W3C)
- Event Schedule. Note: since the underlying EU project started (1 January 2012) before the working group, some events are before the creation of the working group.
3 Draft documents and time line
- Draft ITS 2.0 (version 23 October 2012)
- ITS 2.0 draft (editor's copy) and changes since version 23 October 2012. For the editors: editors assignments
- Draft Requirements and Use Cases (editor's copy)
- Draft Requirements and Use Cases (version 24 May 2012)
- Use_cases - high level summary
- Timeline: next planned step is to enter last call by the end of November 2012
4 Deliverables, WPs
The following deliverables are specific to the underlying EU project. We will make sure that the working group runs in sync with the plan described below.
- Work Packages
5 Testing and Demonstration
A Test Suite is under development to support conformance testing of ITS2.0 implementations. Refer to the following for details on Test Suite Development.
GitHub repository is here: https://github.com/finnle/ITS-2.0-Testsuite
To encourage and promote the uptake of ITS, the WG aims to document Use Case Demonstrations (see high level summary).
6 Meetings
We are using gotomeeting. The meeting ID for our regular call each Thursday will be given in the call agenda sent to the public list. Default dial in info is here, but check the public list for the latest dial in info.
See also the scribe list.
6.1 Upcoming
Each call is one hour, followed by a 1 1/2 hour life editing call. For people who cannot be on these and the online specification editing calls: a diff is available. It will be updated after each editing call and highlights the changes made. Co-editors, check the process of updating the diff.
- Phone call 26 November, 4 p.m. UTC (ICS format)
- Extended online specification editing 27 November, 1pm to 5pm UTC
- Extended online specification editing 28 November, 1pm to 5pm UTC
- Phone call 3 December, 4 p.m. UTC (ICS format)
- Test suite webinar 4 December, 2 p.m. UTC (ICS format)
- Phone call 10 December, 4 p.m. UTC (ICS format)
- Phone call 17 December, 4 p.m. UTC (ICS format)
- Phone call 7 January, 4 p.m. UTC (ICS format)
- Phone call 14 January, 4 p.m. UTC (ICS format)
- Phone call 21 January, 4 p.m. UTC (ICS format)
- 24-24 January: PragueJan2013f2f
6.2 Past
- online specification editing 2012-11-20
- Working group call 2012-11-19
- online specification editing 2012-11-14
- Working group call 2012-11-12
- Working group call 2012-11-05
- TPAC face-to-face meeting 1-2 November, Lyon (minutes day one, minutes day two)
- informal small call 2012-10-29
- Working group call 2012-10-22
- Call 15 October cancelled due to Localization World
- Working group call 2012-10-08
- Working group call 2012-10-01
- Prague face-to-face 25-26 September, see the (raw) minutes day 1 and day 2
- Working group call 2012-09-20
- Working group call 2012-09-13
- Working group call 2012-09-06
- Working group call 2012-08-30
- Working group call 2012-08-23
- 2012-08-16 cancelled
- Working group call 2012-08-09
- Working group call 2012-08-02
- Working group call 2012-07-26
- Working group call 2012-07-19
- Working group call 2012-07-12
- Working group call 2012-07-05
- Working group call 2012-06-28
- Working group call 2012-06-21
- June 11-13 2012: Dublin face-to-face meeting: preliminary presentations, minutes of June 11, June 12, June 13
- Working group call 2012-05-31
- Work package leader meeting 2012-05-31 (minutes to be provided)
- Working group call 2012-05-24
- Working group call 2012-05-17
- Working group call 2012-05-10
- Working group call 2012-05-04
- Working group call 2012-04-26
- Working group call 2012-04-20, in .PDF format as problem with RSSGenerated Minutes: Media:20thAprilLT-WebMinutes.pdf
- Working group call 2012-04-12
- Working group call 2012-04-06
- Working group call 2012-03-29
- Luxembourg March 2012 face-to-face meeting and MLW workshop
- Working group call 2012-03-09
- ExecBoard-2012-02-23
- Frankfurt February 2012 face-to-face meeting (summary of outcome and action items)
- ExecBoard-2012-02-16
- ExecBoard-2012-02-09
- ExecBoard-2012-01-26
- Berlin January 2012 face-to-face meeting, including initial findings
