Difference between revisions of "WorkplanTillFinalPublication"

From Provenance WG Wiki
Jump to: navigation, search
(prov-xyz template)
(Note-track Documents)
Line 23: Line 23:
  
 
=== prov-primer ===
 
=== prov-primer ===
 +
 +
* Outstanding issues on tracker:
 +
We do not anticipate any changes to the primer from the open issues below, but this depends partly on reviewer acceptance of proposed responses.
 +
** Issues 561, 562, 563 and 564 are addressed and responded to but require approval/confirmation/closure by commenter
 +
** Issue 592 is still to be addressed, but is not going to alter the primer, instead being addressed in the FAQ (as agreed by the group)
 +
** Issue 616 has been addressed and agreed with the commenter (adopting a suggestion), and so can be closed
 +
* Document ready for internal review: 28 March
 +
* Reviewers: ''please volunteer, to be finalized at teleconference''
 +
* Reviews complete by: 4 April
 +
* Changes incorporate by: 11 April
 +
* Final vote: 18 April 2013 (last teleconference before staging deadline)
 +
* Final staging: 23 April 2013
 +
 
=== prov-xml ===
 
=== prov-xml ===
 
=== prov-aq ===
 
=== prov-aq ===

Revision as of 10:18, 8 March 2013

Workplan Till Final Publication

When documents are staged, please update urls on publication request page PublicationRequestApril30

Rec-track Documents

No editing, except spelling mistakes.

April 23: final staging

Note-track Documents

for each document, please complete the following template

prov-xyz template

  • Outstanding issues on tracker:
  • Document ready for internal review:
  • Reviewers: please volunteer, to be finalized at teleconference
  • Reviews complete by:
  • Changes incorporate by:
  • Final vote: 18 April 2013 (last teleconference before staging deadline)
  • Final staging: 23 April 2013

prov-primer

  • Outstanding issues on tracker:

We do not anticipate any changes to the primer from the open issues below, but this depends partly on reviewer acceptance of proposed responses.

    • Issues 561, 562, 563 and 564 are addressed and responded to but require approval/confirmation/closure by commenter
    • Issue 592 is still to be addressed, but is not going to alter the primer, instead being addressed in the FAQ (as agreed by the group)
    • Issue 616 has been addressed and agreed with the commenter (adopting a suggestion), and so can be closed
  • Document ready for internal review: 28 March
  • Reviewers: please volunteer, to be finalized at teleconference
  • Reviews complete by: 4 April
  • Changes incorporate by: 11 April
  • Final vote: 18 April 2013 (last teleconference before staging deadline)
  • Final staging: 23 April 2013

prov-xml

prov-aq

prov-overview

prov-dc

prov-dictionary

prov-sem

prov-links

prov-implementations

Other Tasks

Who is taking leadership for what? What is the timetable?

Namespace

HTML pages

Provenance of documents

  • Participants: Luc

Wiki

FAQ

Tools

Implementations