Difference between revisions of "WorkplanTillFinalPublication"

From Provenance WG Wiki
Jump to: navigation, search
(prov-overview)
(prov-overview)
Line 55: Line 55:
 
Note I'm under the assumption that there will not be anything radical added to the document.
 
Note I'm under the assumption that there will not be anything radical added to the document.
  
2013-03-14: call for review ask for additions
+
* 2013-03-14: call for review ask for additions
2013-03-28: end of additions
+
* 2013-03-28: end of additions
2013-04-04: all additions done sent for last looks
+
* 2013-04-04: all additions done sent for last looks
2013-04-23; Final staging
+
* 2013-04-23; Final staging
  
 
=== prov-dc ===
 
=== prov-dc ===

Revision as of 17:12, 13 March 2013

Workplan Till Final Publication

When documents are staged, please update urls on publication request page PublicationRequestApril30

Rec-track Documents

No editing, except spelling mistakes.

April 23: hard deadline for final staging

  • prov-o: ...
  • prov-dm: final staging: April 11 (luc non available 13-21)
  • prov-n: final staging: April 11 (luc non available 13-21)
  • prov-constraints: final staging: April 11 (luc non available 13-21)

Note-track Documents

for each document, please complete the following template

prov-xyz template

  • Outstanding issues on tracker:
  • Document ready for internal review:
  • Reviewers: please volunteer, to be finalized at teleconference
  • Reviews complete by:
  • Changes incorporate by:
  • Final vote: 18 April 2013 (last teleconference before staging deadline)
  • Final staging: 23 April 2013

prov-primer

  • Outstanding issues on tracker:

We do not anticipate any changes to the primer from the open issues below, but this depends partly on reviewer acceptance of proposed responses.

    • Issues 561, 562, 563 and 564 are addressed and responded to but require approval/confirmation/closure by commenter
    • Issue 592 is still to be addressed, but is not going to alter the primer, instead being addressed in the FAQ (as agreed by the group)
    • Issue 616 has been addressed and agreed with the commenter (adopting a suggestion), and so can be closed
  • Document ready for internal review: 28 March
  • Reviewers: please volunteer, to be finalized at teleconference
  • Reviews complete by: 4 April
  • Changes incorporate by: 11 April
  • Final vote: 18 April 2013 (last teleconference before staging deadline)
  • Final staging: 23 April 2013

prov-xml

prov-aq

  • 2013-03-14: issues triaged (resolved / further change needed / out-of-scope).
  • 2013-03-21: resolved outstanding issues; document updated to reflect issues consensus; call for final reviews (2 week period).
  • 2013-04-04: all review comments clarified and/or resolved.
  • 2013-04-11: update spec for resolved issues arising from reviews.
  • 2013-04-18: document clean, all issues closed, ready for staging.
  • 2013-04-23; Final staging

At this point, I expect to hand over to Paul for final processing and publication.

prov-overview

Note I'm under the assumption that there will not be anything radical added to the document.

  • 2013-03-14: call for review ask for additions
  • 2013-03-28: end of additions
  • 2013-04-04: all additions done sent for last looks
  • 2013-04-23; Final staging

prov-dc

prov-dictionary

  • Outstanding issues on tracker: 10 ( http://www.w3.org/2011/prov/track/products/19 )
  • Document ready for internal review: March 28
  • Reviewers: please volunteer, to be finalized at teleconference
  • Reviews complete by: April 4
  • Changes incorporate by: April 17
  • Final vote: 18 April 2013 (last teleconference before staging deadline)
  • Final staging: 23 April 2013

prov-sem

  • Outstanding issues on tracker:

There are two: one a placeholder for an external reviewer comment on PROV-CONSTRAINTS, another about the scope/goal of PROV-SEM. Both have been discussed but not addressed in the document yet. I will initiate discussion to ensure that they are addressed in the review version.

  • Document ready for internal review: April 8
  • Reviewers: please volunteer, to be finalized at teleconference on April 4. Hopefully most of Satya, Simon, Luc, Paolo, Khalid who reviewed the first release.
  • Reviews complete by: April 11
  • Changes incorporate by: April 15
  • Final vote: 18 April 2013 (last teleconference before staging deadline)
  • Final staging: 23 April 2013

prov-links

We do not anticipate any significant change to the document. Just a read-through by the editors, and updating of sotd/bibliography.

  • Outstanding issues on tracker: none
  • Document ready for internal review: March 28
  • Reviewers: please volunteer, to be finalized at teleconference
  • Reviews complete by: April 4
  • Changes incorporated by: April 11
  • Final vote: 11 April 2013 (last teleconference before staging deadline)
  • Final staging: 12 April 2013 (luc non available 13-21)

prov-implementations

Other Tasks

Who is taking leadership for what? What is the timetable?

Namespace

HTML pages

Provenance of documents

  • Participants: Luc
  • Tim to aggregate and review prov-o's prov

Wiki

FAQ

Tools

Implementations