Deliverables by month

end M no WP desc lead est person-m
2002-05-28 (1) 3.3 3 Provide a public discussion list for the project (0.2 months, mailing list, Pub.) 1 0.2
2002-05-28 (1) std3.2 3 Provide a public website for the project: a central site from which all work done as part of the project can be found. Incorporate, using Semantic Web technology, pointers from discussion lists and other work. Maintain pointers to work in progress as well as finished The site will provide project overviews and highlights; up-to-date information on intermediate and final project results, including public reports and synthesis reports drawn from selected confidential material; project events, including e.g. user group meetings, conferences and workshops; contact details, etc. The Website will be cross-linked from/to other relevant EC and EC sponsored sites. work. (1 month, website, Pub.) 1 1
2002-05-28 (1) std3.1 3 The Contractors undertake to provide a brief project Fact Sheet suitable for web publishing, within one month from the start of the project, and to maintain and update it until the Contract expiry date. The Fact Sheet will outline the project rationale and objectives, specify the project s technical baseline and intended target groups and application domains, and detail intermediate and final outputs. Said Fact Sheet will be used by the Commission for its own dissemination and awareness activities throughout the project lifecycle, and will be published on EC and EC sponsored websites. (0.2 months, report, Pub.) 1 0.2
2002-07-28 (3) 10.1 10 Public report evaluating existing Free Software/Open Source RDF storage systems. (2 months, report, Pub.) 1 2
2002-07-28 (3) 3.5 3 The Dissemination and Use plan will describe plans for the dissemination of knowledge gained during the work, and the plans for exploitation of the results of the project among the different target groups, for example big industry; content producers, researchers and academics; the Opensource community; developers. Different partners have different connections to these communities. Expected locations for presentation of information about SWAD-Europe will be detailed in the Dissemination and use plan, but are likely to include: WWW conferences; XML Europe and XML International conference series. (2 months, report, Pub.) 1 2
2002-07-28 (3) std1.1 1 Standard Quarterly management report Q1 (1 month, report, Internal) 1 1
2002-08-28 (4) 3.6 3 Report of a developer workshop held in a European country by project team members. Developer workshops will be workshops specifically directed at implementation of Semantic Web approaches that improve the functionality of existing and new systems, such as authoring support for accessibility, or improving Web Service search systems. These workshops will build on the results of workpackages to transfer knowledge as fast as possible to the broader European software development community. (2 months, report, Pub.) 1 2
2002-08-28 (4) 4.1 4 Public document describing the then state of the art concerning XML graph serialization syntaxes for example in RDF, Web Ontologies and SOAP. (4 months, report, Pub.) 1 4
2002-08-28 (4) 3.4 3 An Initial workshop will bring together participants in Semantic Web activities from Europe and internationally. The report will concentrate on gathering requirements relevant to the work in this project, and assessing the then-current state of the art. (2 months, report, Pub.) 1 2
2002-08-28 (4) 2.1 2 Project technical direction plan. A document describing the overall future technical direction of the project, including related technologies, committees and interest group. (2 months, report, Pub.) 1 2
2002-09-28 (5) 10.2 10 Public report on mapping data from RDBMS. This will describe current best practice on using existing RDBMS or other storage systems for general Semantic Web data. (2 months, report, Pub.) 1 2
2002-09-28 (5) 12.2.1 12.2 Public demonstrator showing the creation, storage, query and display of RDF annotations for a specific schema, and enabling access to the data using multiple clients but a common protocol and schema (9 months, demonstrator, Pub.) 1 9
2002-10-28 (6) 12.1.1 12.1 Report describing chosen demonstrators and rationale (3 months, report, Pub.) 1 3
2002-10-28 (6) 7.1 7 Public document comparing existing RDF API functionality (2 months, report, Pub.) 1 2
2002-10-28 (6) 5.1 5 Public report on the state of the art in deployed tools/techniques on schema technology. This report will address: annotating syntactic (XML) schemas to include mapping information that shows how XML structures relate to their equivalent as RDF graphs; Schematron; Meaning Definition Language (MDL); Representation of the XML Infoset and Post-Schema Validation Infoset (PSVI) in RDF; Schema Adjunct Framework; XML Schema 1.* requirements; RELAX-NG; (2 months, report, Pub.) 1 2
2002-10-28 (6) std1.6 1 Standard Semestrial progress report S1 (1 month, report, Internal) 1 1
2002-10-28 (6) std1.11 1 Standard Annual public report A1 (1 month, report, Pub.) 1 1
2002-10-28 (6) 12.2.2 12.2 Report detailing the method of creating the annotation server and client demonstration, including the protocol and schema. This will form a detailed 'how to' document. (2 months, report, Pub.) 1 2
2002-12-28 (8) 4.2 4 Public design document describing the architecture of a working SOAP-based "Semantic Web Service", e.g. showing the use of W3C's XML Protocol and Web Service specifications to describe, discover and communicate with remote RDF/Semantic Web query or inference services. The design document will be backed up by working examples. (6 months, report, Pub.) 1 6
2002-12-28 (8) 3.7 3 Report of a developer workshop in a European country by project team members. (2 months, report, Pub.) 1 2
2002-12-28 (8) 12.1.2 12.1 Requirements specification for demonstrator 1 derived from analysis in report on chosen demonstrators (3 months, specification, Pub.) 1 3
2002-12-28 (8) 7.2 7 Public report comparing existing RDF query language functionality, documenting different scenarios and users for RDF query languages (for example scripters, programmers; data, schema) (2 months, report, Pub.) 1 2
2003-01-28 (9) std1.2 1 Standard Quarterly management report Q2 (1 month, report, Internal) 1 1
2003-02-28 (10) 5.2 5 Public release of a Free Software / Open Source XSLT, Schematron or other schema language-based implementation that shows how lightweight, free tools can be used to extract Semantic Web information models from "colloquial" XML that was originally produced without targeting the Semantic Web or RDF. (12 months, software, Pub.) 1 12
2003-02-28 (10) 10.3 10 A Free Software/Open Source RDF storage system along, with report and documentation on implementation issues found, for a developer audience. (6 months, software, Pub.) 1 6
2003-02-28 (10) std3.8 3 To provide at the latest by the first peer review, a comprehensive MS-PowerPoint or HTML Presentation detailing all the key features of the project. A final, augmented version of this Presentation will be transmitted to the Commission together with the project's final report, and will where appropriate contain additional multimedia assets (e.g. video clips). Said Presentation will be used by the Commission for its own dissemination and awareness activities, during and after the completion of the project, and will where appropriate be published on EC and EC sponsored websites, and other electronic publications. (1 months, presentation, Pub.) 1 1
2003-04-28 (12) 2.2 2 Technical report from SWAD-Europe for W3C groups, summarising findings of implementation and research with emphasis on their relevance to current and planned W3C standardization activities. (2 months, report, Pub.) 1 2
2003-04-28 (12) 7.3 7 Public release of reference implementation of an RDF API which may build upon existing implementations. Open Source/free software. (6 months, software, Pub.) 1 6
2003-04-28 (12) std1.7 1 Standard Semestrial progress report S2 (1 month, report, Internal) 1 1
2003-04-28 (12) 3.9 3 Report of a developer workshop in a European country by project team members. (2 months, report, Pub.) 1 2
2003-04-28 (12) 9.1 9 Publication of a document (to be proposed to W3C for consideration as a W3C Note) on the use of Semantic Web to support the creation of accessible Web content (6 months, report, Pub.) 1 6
2003-06-28 (14) 8.2 8 Public discussion document relating an RDF thesaurus schema to at least two more complex RDF ontologies (2 months, report, Pub) 1 2
2003-06-28 (14) 12.1.3 12.1 Demonstrator 1 made public (8 months, demonstrator, Pub.) 1 8
2003-06-28 (14) 12.3.1 12.3 Public release of Transformation Library to convert content from XML formats to an RDF representation and vice versa (3 months, software, Pub.) 1 3
2003-07-28 (15) 5.3 5 Public RDF/XML Test cases for RDF Logic, Web Ontology and Maths content. A set of RDF/XML test cases illustrating the combination of MathML content with RDF and Web Ontology (eg. DAML) content; these tests will draw on use cases and be presented in a form consistent with the techniques adopted by W3C Semantic Web Activity Working Groups, and with the W3C Quality Assurance Activity. (6 months, test cases, Pub.) 1 6
2003-07-28 (15) 3.10 3 Public Report summarising findings from developer outreach (2 months, report, Pub.) 1 2
2003-07-28 (15) std1.3 1 Standard Quarterly management report Q3 (1 month, report, Internal) 1 1
2003-08-28 (16) 12.1.4 12.1 Public report on lessons learned as feedback to tool developers from Demonstrator 1 (3 months, report, Pub.) 1 3
2003-08-28 (16) 7.4 7 Public release of a "strawman" query language implementation incorporating current best practice, which may use or build upon existing implementations. Open Source/free software. (6 months, software, Pub.) 1 6
2003-08-28 (16) 3.11 3 Report of a developer workshop in a European country by project team members. (2 months, workshop, Pub.) 1 2
2003-08-28 (16) 8.1 8 Public draft of an ISO-compatible RDF thesaurus schema (6 months, specification, Pub.) 1 6
2003-08-28 (16) 12.4.1 12.4 An Open Source/Free Software demonstration of searching a large scale Semantic Web system via simple keywords returning data from multiple sources. The results will indicate information provenance within a dynamically generated interface using appropriate metaphors such as the portal style. (6 months, demonstrator, Pub.) 1 6
2003-10-28 (18) std1.8 1 Standard Semestrial progress report S3 (1 month, report, Internal) 1 1
2003-10-28 (18) 12.3.2 12.3 Public release of modified tools able to incorporate transformation toolkits (2 months, software, Pub.) 1 2
2003-10-28 (18) 12.1.5 12.1 Public requirements specification for demonstrator 2 derived from analysis in report on chosen demonstrators (2 months, report, Pub.) 1 2
2003-10-28 (18) std1.12 1 Standard Annual public report A2 (1 month, report, Pub.) 1 1
2003-10-28 (18) 2.3 2 Public report on direction from Advisory Group meetings. The meetings will be held twice a year in an appropriate location. The discussions and architectural decisions made in the meeting will be summarised in this document. (2 months, report, Pub.) 1 2
2003-10-28 (18) 8.3 8 Public discussion document showing a schema supporting multilingual thesaurus terms and including a revised RDF Thesaurus Schema extended to encode multilingual information (2 months, report, Pub) 1 2
2003-12-28 (20) 6.1 6 Public release of service illustrating the extraction of semantic data from "colloquial" XML. (6 months, prototype, Pub.) 1 6
2003-12-28 (20) 3.12 3 Report of a developer workshop in a European country by project team members. (2 months, workshop, Pub.) 1 2
2003-12-28 (20) 8.4 8 Public discussion document showing cross-mapping between thesauri (2 months, report, Pub) 1 2
2003-12-28 (20) 9.2 9 Documentation of proposals for the incorporation of techniques developed in SWAD-Europe into relevant W3C notes and specifications. The exact content proposals will be refined on the advice of the Advisory Group and through liaison with WAI, but will probably relate to the themes addressed by the following W3C Notes: "Techniques for Authoring Tool Accessibility Guidelines", "Techniques for User Agent Accessibility Guidelines", "Techniques for Web Content Accessibility Guidelines" and possibly the W3C document currently in draft form as "XML Accessibility Guidelines". The report will summarise any feedback from the relevant W3C groups. (4 months, report, Pub.) 1 4
2004-01-28 (21) std1.4 1 Standard Quarterly management report Q4 (1 month, report, Internal) 1 1
2004-01-28 (21) 6.2 6 Public release of service illustrating use cases for combining MathML, RDF and Web Ontology. (6 months, prototype, Pub.) 1 6
2004-02-28 (22) 6.3 6 Public online documentation for both prototypes, with pointers into relevant literature. (2 months, report, Pub.) 1 2
2004-03-28 (23) 11.1 11 A public report giving implementation experience and advice on the integration of legacy authentication systems with Semantic Web technologies (6 months, report, Pub.) 1 6
2004-03-28 (23) 8.5 8 Public discussion document showing encoding of classification schemes (2 months, report, Pub) 1 2
2004-04-28 (24) 12.1.6 12.1 Demonstrator 2 made public (8 months, demonstrator, Pub.) 1 8
2004-04-28 (24) 9.3 9 Report on implementation of Semantic Web techniques to assist in authoring: finding images via the semantic web for a person with vision impairment, and finding descriptions of images via semantic web to streamline process of adding descriptive text. (4 months, prototype / report, Pub.) 1 4
2004-04-28 (24) 3.13 3 Report of a developer workshop in a European country by project team members. (2 months, workshop, Pub.) 1 2
2004-04-28 (24) 8.6 8 Public discussion document showing encoding of thesaurus schema using DAML+oil (2 months, report, Pub) 1 2
2004-04-28 (24) std1.9 1 Standard Semestrial progress report S4 (1 month, report, Internal) 1 1
2004-05-28 (25) 8.7 8 Public research prototype incorporating one or more of the aspects of RDF thesaurus extensions: DAML+OIL schema extensions, multilingual thesaurus terms, encoding of classification schemes, cross-mapping between thesauri. (6 months, prototype, Pub.) 1 6
2004-06-28 (26) 11.2 11 Release of an Open Source/Free Software toolkit that implements signature chaining, capability handling and proof-based trust using RDF. (25 months, software, Pub.) 1 25
2004-06-28 (26) 12.1.7 12.1 Public report on lessons learnt as feedback to tool developers from Demonstrator 2. (3 months, report, Pub.) 1 3
2004-07-28 (27) std1.5 1 Standard Quarterly management report Q5 (1 month, report, Internal) 1 1
2004-07-28 (27) 8.8 8 Public report showing existing information scientists how to migrate from their current systems to RDF based semantic web ones, with examples. (2 months, report, Pub.) 1 2
2004-08-28 (28) 3.14 3 Developer workshop in a European country by project team members. (2 months, workshop, Pub.) 1 2
2004-08-28 (28) 12.1.8 12.1 Public report on lessons learned from the two demonstrators as feedback to tool developers, incorporating information about how the demonstrator was created and the tools used. (3 months, report, Pub.) 1 3
2004-09-28 (29) 3.16 3 The final workshop report will concentrate on gathering the results to date of work done by the participants, and outline directions which future research should investigate that are beyond the expected scope of this project. (2 month, report, Pub.) 1 2
2004-09-28 (29) 3.15 3 The Technology Implementation Plan (TIP) will assess the practical commercial application of tools and information in the project and semantic web technologies outside the project, and detail lessons learned so that third party users of Semantic Web technologies get a clear idea of the benefits and limitations of semantic web technologies used both outside and inside the project. Expected locations for presentation of information about SWAD-Europe will be detailed in the Dissemination and use plan, but are likely to include: WWW conferences; XML Europe and XML International conference series. (2 months, report, Pub.) 1 2
2004-10-28 (30) std1.10 1 Standard Semestrial progress report S5 (1 month, report, Internal) 1 1
2004-10-28 (30) std3.17 3 To supply at the latest by the date of submission of the final report a web enabled (or CD/DVD based) Showcase, and to grant the Commission the right to use said Showcase for its own dissemination and awareness activities, including web based and electronic publications, after the completion of the project. The Showcase will feature a meaningful subset (software, data, etc.) of the functionality characterising the project demonstrator(s) arrived at, along with relevant copyright notices and contact information, and suitable installation aids and run-time interfaces. (2 months, website, Pub.) 1 2
2004-10-28 (30) std1.13 1 Standard Final public synthesis report (1 month, report, Pub.) 1 1

Cross checking totals
non-standard deliverables:
57 deliverables, ok
standard deliverables:
17 deliverables, ok

total months for non-standard deliverables 224.2